Environment

Experience has been accumulated in design and construction that meets regulatory requirements in the environmentally critical plant engineering sector.

ㆍ vironmental Plant Design and Construction Projects
ㆍ Construction Experience of Wastewater Treatment Facilities
ㆍ Execution of Environmental Plant EPC Projects
ㆍ Construction of Environmental Plants Reflecting Regulatory Standards


SCRUBBER

윈테크의 스크러버 설치 사진
Activated Carbon Tower Fabrication and Installation for Bio-U Project, KG Chemical Co., Ltd. 

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025

Global Battery Materials Corp. Vacuum Belt Filter System_Revamping 

Client : Global Battery Materials Corp.
Service: EPC
Year: 2025

Performance Diagnosis of Air Pollution Control Facilities and Duct Improvement Design for SeAH M&S Co., Ltd. 

Client : SeAH M&S Co., Ltd.
Service: EPC
Year: 2025

A/C Tower (2 Sets) Fabrication and Supply for Dongyang Plant Co., Ltd. 

Client : Dongyang Plant Co., Ltd.
Service: EPC
Year: 2025

Environmental Facility Improvement Work for A-Project at Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2025

Supply of Instruments for Waste Heat Recovery Unit (WHRU)  

Lapsys ENG Co., Ltd.
Service: EPC
Year: 2025

Fabrication and Installation of FRP Scrubber for Gongju Plant 

Client : Dongin Chemical Co., Ltd. : EPC
Year: 2025

Portable Pump & Filter Unit Supply  

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year: 2025

Installation of Magnetic Filter and N₂ Area Flow Meter for Gwangyang Precursor Plant Phase 2 

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

Kyungdong E&S Co., Ltd. KDTT K2 Project Scrubber 

Client : Kyungdong E&S Co., Ltd.
Service: EPC
Year: 2025

Bag Filter Lower Dust Hopper Installation (2 Sets), SeAH M&S Co., Ltd. 

Client : SeAH M&S Co., Ltd.
Service: EPC
Year: 2025

Gyeoldong Mobile Dust Collector Installation and Related Works, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2024

Filter Line Modification Work, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2025

Scrubber Fabrication and Installation and Related Works, Kolon Life Science Co., Ltd. 

Client: Kolon Life Science Co., Ltd.
Service: EPC
Year: 2024

Bag Filter Fabrication and Installation for Dismantling Area, SeAH M&S Co., Ltd. 

Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2024

Wastewater Treatment Plant Equipment Fabrication, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2024

Paint Booth and Adsorption Tower Fabrication and Installation for Eco Land Project, Ains Co., Ltd. 

Client: Ains Co., Ltd.
Service: EPC
Year: 2024

Existing Scrubber Modification Work, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2023

Scrubber (10 CMM) Fabrication and Installation, PSG Co., Ltd. 

Client : ㈜PSG
Service: EPC
Year: 2023

National R&D Project for Net-Zero Demand Management, WooYang H&C Co., Ltd. 

Client: WooYang H&C Co., Ltd.
Service: EPC
Year: 2022

AC Tower (100 CMM) Modification Work, Daeshin Metal Co., Ltd. 

Client: Daeshin Metal Co., Ltd.
Service: EPC
Year: 2022

Manufacturing and Installation of AC Tower (37 CMM), Korea Petroleum Industrial Co., Ltd. 

Client: Korea Petroleum Industrial Co., Ltd.
Service: EPC
Year: 2022

Installation Work of Printing and Adsorption Tower, IC Max Co., Ltd. 

Client: IC Max Co., Ltd.
Service: EPC
Year: 2022

AC Tower (100 CMM) Modification Work, Youngshin TR (GSE) Co., Ltd. 

Client: Youngshin TR Co., Ltd.
Service: EPC
Year: 2022

AC Tower (500 CMM) Fabrication and Installation including Water Supply Piping, Seojin T&A Co., Ltd. 

Client: Seojin T&A Co., Ltd.
Service: EPC
Year: 2022

Scrubber and AC Tower Fabrication and Installation, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2022

AC Tower Fabrication and Installation, Pharmicell Co., Ltd.

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2022

FC Plant Chemical Control Act (Hazardous Chemicals Regulation) Compliance Work, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

AC Tower (110 CMM) Fabrication and Installation for Central Research Institute, Aekyung Petrochemical Co., Ltd. 

Client: Aekyung Petrochemical Co., Ltd. Central Research Institute
Service: EPC
Year: 2021

AC Tower (40 CMM) Fabrication and Installation, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021

AC Tower (1250 CMM) Fabrication and Installation and Related Works, Aekyung Petrochemical Co., Ltd.  

Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2021

SC-901 Scrubber Fabrication for E-P Project, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2021

Adsorption Tower Design for Exhaust Gas Treatment (P-7 Project), Aekyung Petrochemical Co., Ltd. 

Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2021

Scrubber Repair Work, Daehospecial Steel Co., Ltd. 

Client: Daehospecial Steel Co., Ltd.
Service: EPC
Year: 2021

Wet Scrubber (450 CMM) Fabrication and Installation, NH Chemical Co., Ltd. 

Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021

AC Tower (100 CMM) Fabrication and Installation, Seyang Lube Co., Ltd. 

Client: Seyang Lube Co., Ltd.
Service: EPC
Year: 2021

 EO Tank System Environmental Facility Fabrication and Installation (E-P Project), KPX Chemical Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021

SUMaterials㈜ Dust Collector Maintenance 

Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2021

Research Reactor Wastewater Treatment System, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2020

AC Tower Replacement (Unit 1) at Nonsan Plant, Dongwha Electrolyte Co., Ltd. 

Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020

Scrubber Fabrication and Installation for NMP Plant (Hungary), Dongwha Electrolyte Co., Ltd. 

Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020

Bag Filter Fabrication and Installation, Giant Chemical Co., Ltd. 

Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020

Air Pollution Control Facility Manufacturing and Duct Installation for New Plant, Terrawin Printing Co., Ltd. 

발주처 : (주)테라윈프린팅
Service: EPC
Year: 2020

Wet Scrubber and Ash Tower Fabrication, SK Chemical Co., Ltd. 

SK Chemical Co., Ltd.
Service: EPC
Year: 2020

Air Pollution Control Facility and IoT System Installation Work, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2020

Air Pollution Control Facility and IoT System Installation Work, Woorim Heat Treatment Co., Ltd.  

Client: Woorim Heat Treatment Co., Ltd.
Service: EPC
Year: 2020

AC Tower (80 CMM, Portable Type) Fabrication, Giant Chemical Co., Ltd. 

Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020

AC Tower and Wet Scrubber Environmental Facility (145 CMM) Fabrication and Installation, Korea SanNopco Co., Ltd. 

Client: Korea SanNopco Co., Ltd.
Service: EPC
Year: 2020

AC Tower (70 CMM) Fabrication and Installation and Related Works, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020

Environmental Facility (100 CMM) Fabrication and Installation with 3-Stage Treatment System (Filtration, Adsorption, Scrubbing), Sein ENG Co., Ltd. 

Client: Sein ENG Co., Ltd
Service: EPC
Year: 2020

Dust Collector Pulse Valve Replacement and Related Works, SUMaterials Co., Ltd. 

Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2019

Bag Filter and Cartridge Filter Fabrication and Delivery, WEMAS Co., Ltd. 

Client: WEMAS Co., Ltd.
Service: EPC
Year: 2019

Filtration Dust Collector Stack Modification (40 CMM), SM Plantec Co., Ltd. 

Client: SM Plantec Co., Ltd.
Service: EPC
Year: 2019

AC Tower (70 CMM) Fabrication and Installation and Related Works, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2019

Adsorption Tower (70 CMM) Fabrication and Installation, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2019

Environmental Facility Improvement Work at Board Chemical Plant (Formaldehyde Absorption Tower), Dongwha Enterprise Co., Ltd. 

Client: Dongwha Enterprise Co., Ltd.
Service: EPC
Year: 2019

AC Tower (60 CMM) Fabrication and Installation, Portrex Chemical Co., Ltd. 

Client: Portrex Chemical Co., Ltd.
Service: EPC
Year: 2019

Filtration Dust Collector (40 CMM) Fabrication and Installation, SM Plantec Co., Ltd. 

Client: SM Plantec Co., Ltd.
Service: EPC
Year: 2019

Filtration Dust Collection System Installation for Primary Calcination Furnace (Jeonju Plant), Aekyung Petrochemical Co., Ltd. 

Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2019

Scrubber Fabrication for E-REF-15 Project, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2019

Cyclone Vortex Finder Fabrication, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Bag Filter Hydraulic Ram Replacement Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Neutralization Scrubber Fabrication and Replacement Work, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Vessel and Filter Components for Plant Expansion Project (Gwangyang Site), POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

A/C Filter Fabrication and Installation, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

AC Tower (250 CMM) Fabrication and Installation, Korea Petrochemical Ind. Co., Ltd. 

Client: Korea Petrochemical Ind. Co., Ltd.
Service: EPC
Year: 2018

Adsorption Tower (30 CMM) Fabrication and Installation, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2018

Mechanical Equipment Performance Improvement Work for Wastewater & FGD Wastewater System (Hadong Thermal Power Plant), Coway Entech Co., Ltd. 

Client: Coway Entech Co., Ltd.
Service: EPC
Year: 2018

New AC Plant Project, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Scrubber Fabrication and Installation for PNS Dryer, KG Chemical Co., Ltd. 

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2018

Vacuum Line Cartridge Filter Installation, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2018