ENVIRONMENT
환경 관련 실적입니다
Environment
Experience has been accumulated in design and construction that meets regulatory requirements in the environmentally critical plant engineering sector.
ㆍ vironmental Plant Design and Construction Projects
ㆍ Construction Experience of Wastewater Treatment Facilities
ㆍ Execution of Environmental Plant EPC Projects
ㆍ Construction of Environmental Plants Reflecting Regulatory Standards
DUST COLLECTOR
A dust collection system is a device that removes solid or liquid fine particles suspended in gas. It includes cyclone-type dust collectors that separate dust using gravity and centrifugal force, and bag filters that remove dust through filtration media.

SCRUBBER
A wet scrubbing system is a facility that captures solid or liquid particles suspended in contaminated gas by using a liquid medium.
Water is commonly used as the scrubbing liquid; however, other fluids may be applied depending on the characteristics of the target gas and contaminants.
Compared to other environmental treatment systems, it offers higher collection efficiency
and is capable of handling high-temperature and high-pressure gas streams.

Activated Carbon Tower Fabrication and Installation for Bio-U Project, KG Chemical Co., Ltd.
Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025
Global Battery Materials Corp. Vacuum Belt Filter System_Revamping
Client : Global Battery Materials Corp.
Service: EPC
Year: 2025
Performance Diagnosis of Air Pollution Control Facilities and Duct Improvement Design for SeAH M&S Co., Ltd.
Client : SeAH M&S Co., Ltd.
Service: EPC
Year: 2025
A/C Tower (2 Sets) Fabrication and Supply for Dongyang Plant Co., Ltd.
Client : Dongyang Plant Co., Ltd.
Service: EPC
Year: 2025
Environmental Facility Improvement Work for A-Project at Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2025
Supply of Instruments for Waste Heat Recovery Unit (WHRU)
Lapsys ENG Co., Ltd.
Service: EPC
Year: 2025
Fabrication and Installation of FRP Scrubber for Gongju Plant
Client : Dongin Chemical Co., Ltd. : EPC
Year: 2025
Portable Pump & Filter Unit Supply
Client: Sangwon Chem Co., Ltd.
Service: EPC
Year: 2025
Installation of Magnetic Filter and N₂ Area Flow Meter for Gwangyang Precursor Plant Phase 2
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025
Kyungdong E&S Co., Ltd. KDTT K2 Project Scrubber
Client : Kyungdong E&S Co., Ltd.
Service: EPC
Year: 2025
Bag Filter Lower Dust Hopper Installation (2 Sets), SeAH M&S Co., Ltd.
Client : SeAH M&S Co., Ltd.
Service: EPC
Year: 2025
Gyeoldong Mobile Dust Collector Installation and Related Works, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2024
Filter Line Modification Work, Eco Chemical Co., Ltd.
Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2025
Scrubber Fabrication and Installation and Related Works, Kolon Life Science Co., Ltd.
Client: Kolon Life Science Co., Ltd.
Service: EPC
Year: 2024
Bag Filter Fabrication and Installation for Dismantling Area, SeAH M&S Co., Ltd.
Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2024
Wastewater Treatment Plant Equipment Fabrication, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2024
Paint Booth and Adsorption Tower Fabrication and Installation for Eco Land Project, Ains Co., Ltd.
Client: Ains Co., Ltd.
Service: EPC
Year: 2024
Existing Scrubber Modification Work, Neo Co., Ltd.
Client: Neo Co., Ltd.
Service: EPC
Year: 2023
Scrubber (10 CMM) Fabrication and Installation, PSG Co., Ltd.
Client : ㈜PSG
Service: EPC
Year: 2023
National R&D Project for Net-Zero Demand Management, WooYang H&C Co., Ltd.
Client: WooYang H&C Co., Ltd.
Service: EPC
Year: 2022
AC Tower (100 CMM) Modification Work, Daeshin Metal Co., Ltd.
Client: Daeshin Metal Co., Ltd.
Service: EPC
Year: 2022
Manufacturing and Installation of AC Tower (37 CMM), Korea Petroleum Industrial Co., Ltd.
Client: Korea Petroleum Industrial Co., Ltd.
Service: EPC
Year: 2022
Installation Work of Printing and Adsorption Tower, IC Max Co., Ltd.
Client: IC Max Co., Ltd.
Service: EPC
Year: 2022
AC Tower (100 CMM) Modification Work, Youngshin TR (GSE) Co., Ltd.
Client: Youngshin TR Co., Ltd.
Service: EPC
Year: 2022
AC Tower (500 CMM) Fabrication and Installation including Water Supply Piping, Seojin T&A Co., Ltd.
Client: Seojin T&A Co., Ltd.
Service: EPC
Year: 2022
Scrubber and AC Tower Fabrication and Installation, Neo Co., Ltd.
Client: Neo Co., Ltd.
Service: EPC
Year: 2022
AC Tower Fabrication and Installation, Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2022
FC Plant Chemical Control Act (Hazardous Chemicals Regulation) Compliance Work, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022
AC Tower (110 CMM) Fabrication and Installation for Central Research Institute, Aekyung Petrochemical Co., Ltd.
Client: Aekyung Petrochemical Co., Ltd. Central Research Institute
Service: EPC
Year: 2021
AC Tower (40 CMM) Fabrication and Installation, Daekwang Industrial Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021
AC Tower (1250 CMM) Fabrication and Installation and Related Works, Aekyung Petrochemical Co., Ltd.
Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2021
SC-901 Scrubber Fabrication for E-P Project, KPX Chemical Co., Ltd.
Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2021
Adsorption Tower Design for Exhaust Gas Treatment (P-7 Project), Aekyung Petrochemical Co., Ltd.
Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2021
Scrubber Repair Work, Daehospecial Steel Co., Ltd.
Client: Daehospecial Steel Co., Ltd.
Service: EPC
Year: 2021
Wet Scrubber (450 CMM) Fabrication and Installation, NH Chemical Co., Ltd.
Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021
AC Tower (100 CMM) Fabrication and Installation, Seyang Lube Co., Ltd.
Client: Seyang Lube Co., Ltd.
Service: EPC
Year: 2021
EO Tank System Environmental Facility Fabrication and Installation (E-P Project), KPX Chemical Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021
SUMaterials㈜ Dust Collector Maintenance
Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2021
Research Reactor Wastewater Treatment System, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2020
AC Tower Replacement (Unit 1) at Nonsan Plant, Dongwha Electrolyte Co., Ltd.
Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020
Scrubber Fabrication and Installation for NMP Plant (Hungary), Dongwha Electrolyte Co., Ltd.
Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020
Bag Filter Fabrication and Installation, Giant Chemical Co., Ltd.
Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020
Air Pollution Control Facility Manufacturing and Duct Installation for New Plant, Terrawin Printing Co., Ltd.
발주처 : (주)테라윈프린팅
Service: EPC
Year: 2020
Wet Scrubber and Ash Tower Fabrication, SK Chemical Co., Ltd.
SK Chemical Co., Ltd.
Service: EPC
Year: 2020
Air Pollution Control Facility and IoT System Installation Work, Neo Co., Ltd.
Client: Neo Co., Ltd.
Service: EPC
Year: 2020
Air Pollution Control Facility and IoT System Installation Work, Woorim Heat Treatment Co., Ltd.
Client: Woorim Heat Treatment Co., Ltd.
Service: EPC
Year: 2020
AC Tower (80 CMM, Portable Type) Fabrication, Giant Chemical Co., Ltd.
Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020
AC Tower and Wet Scrubber Environmental Facility (145 CMM) Fabrication and Installation, Korea SanNopco Co., Ltd.
Client: Korea SanNopco Co., Ltd.
Service: EPC
Year: 2020
AC Tower (70 CMM) Fabrication and Installation and Related Works, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020
Environmental Facility (100 CMM) Fabrication and Installation with 3-Stage Treatment System (Filtration, Adsorption, Scrubbing), Sein ENG Co., Ltd.
Client: Sein ENG Co., Ltd
Service: EPC
Year: 2020
Dust Collector Pulse Valve Replacement and Related Works, SUMaterials Co., Ltd.
Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2019
Bag Filter and Cartridge Filter Fabrication and Delivery, WEMAS Co., Ltd.
Client: WEMAS Co., Ltd.
Service: EPC
Year: 2019
Filtration Dust Collector Stack Modification (40 CMM), SM Plantec Co., Ltd.
Client: SM Plantec Co., Ltd.
Service: EPC
Year: 2019
AC Tower (70 CMM) Fabrication and Installation and Related Works, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2019
Adsorption Tower (70 CMM) Fabrication and Installation, LG Chem Co., Ltd.
Client: LG Chem Co., Ltd.
Service: EPC
Year: 2019
Environmental Facility Improvement Work at Board Chemical Plant (Formaldehyde Absorption Tower), Dongwha Enterprise Co., Ltd.
Client: Dongwha Enterprise Co., Ltd.
Service: EPC
Year: 2019
AC Tower (60 CMM) Fabrication and Installation, Portrex Chemical Co., Ltd.
Client: Portrex Chemical Co., Ltd.
Service: EPC
Year: 2019
Filtration Dust Collector (40 CMM) Fabrication and Installation, SM Plantec Co., Ltd.
Client: SM Plantec Co., Ltd.
Service: EPC
Year: 2019
Filtration Dust Collection System Installation for Primary Calcination Furnace (Jeonju Plant), Aekyung Petrochemical Co., Ltd.
Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2019
Scrubber Fabrication for E-REF-15 Project, KPX Chemical Co., Ltd.
Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2019
Cyclone Vortex Finder Fabrication, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Bag Filter Hydraulic Ram Replacement Work, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Neutralization Scrubber Fabrication and Replacement Work, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
Vessel and Filter Components for Plant Expansion Project (Gwangyang Site), POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018
A/C Filter Fabrication and Installation, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
AC Tower (250 CMM) Fabrication and Installation, Korea Petrochemical Ind. Co., Ltd.
Client: Korea Petrochemical Ind. Co., Ltd.
Service: EPC
Year: 2018
Adsorption Tower (30 CMM) Fabrication and Installation, KPX Chemical Co., Ltd.
Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2018
Mechanical Equipment Performance Improvement Work for Wastewater & FGD Wastewater System (Hadong Thermal Power Plant), Coway Entech Co., Ltd.
Client: Coway Entech Co., Ltd.
Service: EPC
Year: 2018
New AC Plant Project, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
Scrubber Fabrication and Installation for PNS Dryer, KG Chemical Co., Ltd.
Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2018
Vacuum Line Cartridge Filter Installation, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2018