
SECONDARY BATTERY
2차 전지 관련 실적입니다
Secondary Battery
Powder and slurry process-based secondary battery equipment projects have been executed, establishing a quality-oriented production environment.
ㆍ Construction of secondary battery material process plants.
ㆍ Execution of engineering for powder and slurry process equipment in secondary battery applications.
ㆍ Construction of battery material production equipment projects.
ㆍ Supply and Installation of Equipment for Secondary Battery Process.

Cathode materials, anode materials, electrolyte, and separator materials
Beyond the four core materials—cathode, anode, electrolyte, and separator—toward next-generation battery technologies.

Battery recycling process for secondary batteries.
Realization of long-life batteries based on eco-friendly technologies.
Reduction technology for secondary batteries through unit processes such as
raw material input, calcination, filtration, leaching, concentration, and drying.
Provision of sustainable battery realization and eco-friendly solutions.
Based on high technical experience in the entire process of precursor,
active materials, conductive agents, binders, and cathode slurry materials—including dry, wet, drying, washing, filtration, classification, and iron removal processes— we provide optimized solutions.
From natural graphite anode materials to artificial graphite and
silicon-based anode materials, we propose cutting-edge technologies covering both commercial and
next-generation anode materials.
Based on upstream process design tailored to the characteristics of EC, EMC, DMC,
and LiPF raw materials, and through extensive experience in downstream processes such as finishing, packaging, and canister cleaning,
we have demonstrated industry-leading expertise in electrolyte technology
across projects in Korea,
Europe,
and North America.
From separator manufacturing to by-product recovery,
we provide separator process solutions
covering a wide range of materials
for both cathode
and anode applications.
Manufacturing and Construction Work for MC Wax Regeneration System, Win Engineering Co., Ltd.
Client: Win Engineering Co., Ltd.
Service: EPC
Year: 2025
Secondary Battery Recycling Plant Manufacturing Equipment, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025
Secondary Battery Recycling Plant Manufacturing Equipment, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025
5 kW Fuel Cell Reformer Manufacturing and Repair Work, S-Fuelcell Co., Ltd.
Client: S-Fuelcell Co., Ltd.
Service: EPC
Year: 2024
Waste Heat Recovery System (MVR) and Lithium Carbonate Concentration Plant Fabrication, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025
Reactors and Receivers for Phase 2 Expansion Project (Precursor Plant, Gwangyang) Fabrication, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023
Tanks for Phase 2 Expansion Project (Precursor Plant, Gwangyang) Fabrication, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022
COP-1 Line Preventive Maintenance Work at Cathode Material Plant, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019
Small Mixer for Raw Material Supply System (LGCNA Line No. 2), LG Electronics Co., Ltd.
Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2019
CNA Electrode Line No. 2 Auxiliary Mixer Unit, LG Electronics Production Technology Institute Co., Ltd.
Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2018

