Secondary Battery

Powder and slurry process-based secondary battery equipment projects have been executed, establishing a quality-oriented production environment.

ㆍ Construction of secondary battery material process plants.
ㆍ Execution of engineering for powder and slurry process equipment in secondary battery applications.
ㆍ Construction of battery material production equipment projects.
ㆍ Supply and Installation of Equipment for Secondary Battery Process.


wintech seconday battery plant 1
wintech secondary battery factory

Reduction technology for secondary batteries through unit processes such as
raw material input, calcination, filtration, leaching, concentration, and drying.
Provision of sustainable battery realization and eco-friendly solutions.

Manufacturing and Construction Work for MC Wax Regeneration System, Win Engineering Co., Ltd.

Client: Win Engineering Co., Ltd.
Service: EPC
Year: 2025

 Secondary Battery Recycling Plant Manufacturing Equipment, Sebitchem Co., Ltd.

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025

Secondary Battery Recycling Plant Manufacturing Equipment, Sebitchem Co., Ltd. 

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025

5 kW Fuel Cell Reformer Manufacturing and Repair Work, S-Fuelcell Co., Ltd.

Client: S-Fuelcell Co., Ltd.
Service: EPC
Year: 2024

Waste Heat Recovery System (MVR) and Lithium Carbonate Concentration Plant Fabrication, Sebitchem Co., Ltd. 

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025

Reactors and Receivers for Phase 2 Expansion Project (Precursor Plant, Gwangyang) Fabrication, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Tanks for Phase 2 Expansion Project (Precursor Plant, Gwangyang) Fabrication, POSCO Chemical Co., Ltd.

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022

COP-1 Line Preventive Maintenance Work at Cathode Material Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019

Small Mixer for Raw Material Supply System (LGCNA Line No. 2), LG Electronics Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2019

CNA Electrode Line No. 2 Auxiliary Mixer Unit, LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2018