Plant

윈테크는 반응·혼합·분리·저장 등 다양한 화학공정에 필요한 화공플랜트 솔루션을 제공합니다.
공정 특성과 운전 조건, 생산 환경을 종합적으로 검토하여 반응기·열교환기·교반기·증류설비 등 주요 공정설비를 구성하고,
설계부터 제작·조립, 설치·시공 및 시운전까지 프로젝트 전 과정을 체계적으로 수행합니다.

화공플랜트 사진

화공플랜트

Fabrication Capabilities

REACTOR

HEAT EXCHANGER

MIXER

STORAGE TANK

DISSOLVER

DISTILLATION COLUMN

DEAERATOR

FITRATION SYSTEM

PRESSURE VESSEL

PIPING

STRUCTURE

AUTOMATIC CONTROL SYSTEM
자동화 시스템

Slurry Batch Post-Treatment System for Aekyung Chemical Co., Ltd. Daejeon Research Institute

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Leak Test of Two Existing Heat Exchangers for Zeus Petrochemical Co., Ltd.

Client: Zeus Petrochemical Co., Ltd.
Service: EPC
Year: 2025

Inline Homo Mixer System for HC Plant, Nica Korea Co., Ltd.

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025

Repair of Pilot 70L Band Heater for Aekyung Chemical Co., Ltd. Daejeon Research Institute

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Repair Work of SC-1501 Scrubber for Nica Korea Co., Ltd.

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025

Repair Work of SC-1501 Scrubber for Nica Korea Co., Ltd.

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025

Leak Repair Work of Existing R-202 Reactor for Hankem Co., Ltd.

Client: Hankem Co., Ltd.
Service: EPC
Service Period: 2025-12-24

Repair of Si-C DP 50MT Air Compressor for POSCO Future M Co., Ltd. 

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

6PP Granulation Mixer Replacement Project for RIST

Client: Pohang Research Institute of Industrial Science & Technology (RIST)
Service: EPC
Year: 2025

Manufacturing and Delivery of Knock-Out Drum for CNT Project, Enchem Georgia Plant Co., Ltd. 

Client: Enchem Co., Ltd.
Service: EPC
Year: 2025

Heat Exchanger Manufacturing Quotation for Biofuels Project, KG Chemical Co., Ltd.  

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025

Manufacturing of Reactor & Vessel for Biofuels Project, KG Chemical Co., Ltd.  

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025

Installation of Lube Recutting Plant at Onsan Plant, Zeus Petrochemical Co., Ltd. 

Client: Zeus Petrochemical Co., Ltd.
Service: EPC
Year: 2025

Additional Installation of Plate Type Heat Exchanger for Si-C Project, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

Leak Repair of Mixing Tank Nozzle, Daekwang Industrial Co., Ltd.

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2025

Installation Work of Storage Tank for Building C, 2nd Plant, Sebitchem Co., Ltd.

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025

Manufacturing of Vacuum Receiver Tank and Related Equipment, Songwoo EM Co., Ltd. 

Client: Songwoo EM Co., Ltd.
Service: EPC
Year: 2025

New Reactor Manufacturing, Reactor Replacement, and Air Dryer Installation Project, Hwasung Chemical Co., Ltd. 

Client: Hwasung Chemical Co., Ltd.
Service: EPC
Year: 2025

Additional Side Manhole Installation for Two Wastewater Tanks, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

500L Vacuum Dryer Manufacturing and Existing Equipment Improvement Project, Dongin Chemical Co., Ltd. Pyeongtaek Plant   

Client: Dongin Chemical Co., Ltd.
Service: EPC
Year: 2025

Repair Work of Four Condensers at Buyeo Plant, Dongin Chemical Co., Ltd. 

Client: Dongin Chemical Co., Ltd. 
Service: EPC
Year: 2025

Improvement of Existing 500L Reactor for Heesung Catalysts Co., Ltd.  

Client: Heesung Catalysts Co., Ltd.
Service: EPC
Year: 2025

Belt Conveyor Installation (Hopper & Cyclone Section), KH EcoTech Co., Ltd.  

Client: KH EcoTech Co., Ltd.
Service: EPC
Year: 2025

Manufacturing and Delivery of T-8201 Column for Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Steam Trap Replacement Work, Rupax Co., Ltd. 

Client: Rupax Co., Ltd.
Service: EPC
Year: 2025

Fabrication of Two 41CMM AC Towers, Hanyang Industry Co., Ltd. 

Client: Hanyang Industry Co., Ltd.
Service: EPC
Year: 2025

Frozen City Water Piping Response and Air Compressor Repair at Si-C DP City, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

Vent Ozone Condenser Fabrication, Bando ENT Co., Ltd.  

Client: Bando ENT Co., Ltd.
Service: EPC
Year: 2025

Supply of Materials for Upper Shaft Replacement of R-200 Reactor (1.5㎥), Samyang Precision Chemical Co., Ltd.  

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2025

Suction Tank Fabrication, Sangwon Chem Co., Ltd.  

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024

Repair Work of Si-C Chiller Water Pump, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Delivery of Canvas for Kolon Life Science Co., Ltd.   

Client: Kolon Life Science Co., Ltd.
Service: EPC
Year of Service: 2024

Supply and Delivery of New Band Heaters for Aekyung Chemical Co., Ltd.    

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement of O-Ring for Glass Lined Condenser Tube at Gongju Plant, Dongin Chemical Co., Ltd.  

Client: Dongin Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Improvement Work for SR-160 and WR-140, CS Chemical Co., Ltd.    

Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Installation of Decanter Flowmeter, ABC Nanotech Co., Ltd.    

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Installation of Portable Tank Band Heater, ABC Nanotech Co., Ltd.   

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Correction Work for Shaft Vibration of Reactors No. 2 & 3 at Insulation Plant, LX Hausys Co., Ltd.  

Client: LX Hausys Co., Ltd.
Service: EPC
Year of Service: 2024

Disassembly and Installation of WT-120 Motor & Reducer and Related Works, CS Chemical Co., Ltd.  

Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Supply of LNG High-Pressure Gas Production Facility for BioFriends Co., Ltd.    

Client: BioFriends Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement Work of Wastewater Tank, Sangwon Chem Co., Ltd.   

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Installation of Load Cell Shim Plate and Related Works, POSCO Future M (Hanatech) Co., Ltd.    

Client: POSCO Future M (Hanatech) Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing of Emulsifier System, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Additional Construction Work for LiM X1 Project (MVR Part), 4th Plant, Sebitchem Co., Ltd.    

Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024

 Replacement Work of Condensate Tank V-015 for MVR System, 4th Plant, Sebitchem Co., Ltd.    

Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement Work of Shaft for 3㎥ Mixer at Boryeong Plant, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Non-Destructive Testing (NDT) of XYLENE Line, Sangwon Chem Co., Ltd.  

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Installation of Screw Conveyor for 2nd Plant, Sebitchem Co., Ltd.  

Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024

Wastewater Storage Tank Repair, POSCO Future M Co., Ltd.

Client: POSCO Future M Co., Ltd.
Service: EPC
Year of Service: 2024

Hazardous Materials Transport Container Fabrication, G-CHEMS Co., Ltd.   

Client: G-CHEMS Co., Ltd.
Service: EPC
Year of Service: 2024

Repair of Vacuum Pump, Eco Chemical Co., Ltd.  

Client: Eco Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Engineering Service for Expansion Design of BD Distillation Facility at Ulsan Plant, Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing of Canvas, ML Tech Co., Ltd.   

Client: ML Tech Co., Ltd.
Service: EPC
Year of Service: 2024

Chamber Insulation Work for Surface Treatment Equipment (Advanced Materials), Korea Carbon Co., Ltd.  

Client: Korea Carbon Co., Ltd.
Service: EPC
Year of Service: 2024

Repair of N3P-R301 Mechanical Seal, Nica Korea Co., Ltd.   

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

Dehumidification System Fabrication, Hwasung Chemical Co., Ltd. 

Client: Hwasung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement of N3P-R301 Mechanical Seal, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

FC N0 Overhaul Work, Nica Korea Co., Ltd.   

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

30㎥ Methanol Storage Tank Fabrication and Related Works, WooYang H&C Co., Ltd.   

Client: WooYang H&C Co., Ltd.
Service: EPC
Year of Service: 2024

Repair Work of Outdoor Tank at Coating Part, Korea Carbon Co., Ltd. 

Client: Korea Carbon Co., Ltd.
Service: EPC
Year of Service: 2024

Repair Work for Internal Corrosion of R6-701 Reactor, Nica Korea Co., Ltd.  

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

Transfer of 20㎥ Reactor and Electrical Works, Nica Korea Co., Ltd.  

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

Storage Tank Fabrication for ED#1 Project, Eco & Dream Co., Ltd.   

Client: Eco & Dream Co., Ltd.
Service: EPC
Year of Service: 2024

SR-160 Lip Seal Replacement and WR-150 Steam Line Maintenance, CS Chemical Co., Ltd.   

Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Delivery of Manhole Spring Jack, Daelim Engineering Co., Ltd. 

Client: Daelim Engineering Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Delivery of Manhole Spring Jack, Daelim Engineering Co., Ltd. 

Client: Daelim Engineering Co., Ltd.
Service: EPC
Year: 2023

Manufacturing of Anchor Impeller, LX Hausys Co., Ltd. 

Client: LX Hausys Co., Ltd.
Service: EPC
Year: 2023

Ultium CAM  p_CAM_Tank (Feed & Storage Vessels, Reactor)  

Client: Ultium CAM
Service: EPC
Year: 2023

Supply and Installation of Concentration System Plant for 4th Plant, Sebitchem Co., Ltd. 

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023

Vacuum Distillation Tower Repair Work at Ulsan Plant, Michang Oil Industrial Co., Ltd. 

Client: Michang Oil Industrial Co., Ltd.
Service: EPC
Year: 2023

Vibrating Screen Fabrication and Installation for 2nd Plant, Sebitchem Co., Ltd.  

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023

Supply and Installation of Ton Bag Breaker System, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2023

Paint Booth & Auto Roll Filter Fabrication and Installation, Shinmyeong Entec Co., Ltd.  

Client: Shinmyeong Entec Co., Ltd.
Service: EPC
Year: 2023

MVR Part Additional Installation Work for 2nd Plant, Sebitchem Co., Ltd. 

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023

Replacement Work of SR-160 Lip Seal, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2023

Installation Work of GCOP-1 Concentration Filter System at Gwangyang Plant, POSCO Future M Co., Ltd. 

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Installation of 5㎥ Reactor and TCU System, Myungjin Global Co., Ltd.  

Client: Myungjin Global Co., Ltd.
Service: EPC
Year: 2023

EPC Contract for General Handling Permit Related to Chemical Laboratory, Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2023

Knock-Out Drum Fabrication and Installation, EGIS Co., Ltd. 

Client: EGIS Co., Ltd.
Service: EPC
Year: 2023

Drive System Improvement Work for Reactors No. 3 & 4 (Insulation Plant), Manufacturing & Delivery, LX Hausys Co., Ltd. 

Client: LX Hausys Co., Ltd.
Service: EPC
Year: 2023

20 Nm³/hr DME Hydrogen Reforming System, Labsys Korea Co., Ltd. 

Client: Labsys Korea Co., Ltd.
Service: EPC
Year: 2023

Air Tank and Air Header Installation for Existing Plant, RAIENT Co., Ltd. 

Client: RAIENT Co., Ltd.
Service: EPC
Year: 2023

NAPHTHA Project Skid Fabrication, BioFriends Co., Ltd.  

Client: BioFriends Co., Ltd.
Service: EPC
Year: 2023

Receiver System Fabrication, Mokwoo Research Institute Co., Ltd. 

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

Nutsche Filter Fabrication, Mokwoo Research Institute Co., Ltd.  

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

NaOH Feeding System Fabrication, Mokwoo Research Institute Co., Ltd.  

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

TCU Installation for Cooling Water Tank, Polysis Co., Ltd.  

Client: Polysis Co., Ltd. 
Service: EPC
Year: 2023

MC Wax Regeneration System Fabrication for WHP HP01~04 Line, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2023

Air System Fabrication and Installation, Mokwoo Research Institute Co., Ltd. 

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

Replacement of Glass Lined Reactor Impellers (2 Sets), LS Chem Co., Ltd. 

Client: LS Chem Co., Ltd.
Service: EPC
Year: 2023

Existing Ribbon Mixer Modification Work, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2023

Steam Header Fabrication, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2023

 Vacuum Dryer Fabrication and Installation, Mokwoo Research Institute Co., Ltd. 

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

Blower Motor Replacement Work, Sein ENG Co., Ltd. 

Client: Sein ENG Co., Ltd.
Service: EPC
Year: 2023

Pre-Engineering for Base Facilities of Continuous Artificial Graphite Demo Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Installation of SMC Storage Tank, Korea Carbon Co., Ltd. 

Client: Korea Carbon Co., Ltd.
Service: EPC
Year: 2023

Construction of New Liquid Metal Line for Existing COP-3 at Gwangyang Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Installation of Three MC Storage Tanks, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2023

Replacement of Vacuum Dryer Temperature Sensor, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2023

Procurement of Reactors and Receivers for Phase 2 Expansion Investment of Precursor Plant in Gwangyang, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Manufacturing of 5L Pilot Reactor System, Pierita Co., Ltd. 

Client: Pierita Co., Ltd.
Service: EPC
Year: 2022

EP Work for Structural Components of Si-C Anode Material Demo Plant R&D Project, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022

KEZE NOVEL MATERIALS Pilot Reactor 50L Package 

Client: KEZE Novel Materials
Service: EPC
Year: 2022

Manufacturing of Silica Production Plant (150 Ton Capacity), ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022

Procurement of Tanks for Phase 2 Expansion Investment of Precursor Plant (Gwangyang), POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022

Condenser (20㎡) Fabrication, Hwasung Gas Tech Co., Ltd. 

Client: Hwasung Gas Tech Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Existing Bag Filter Bags, Sein ENG Co., Ltd. 

Client: Sein ENG Co., Ltd.
Service: EPC
Year: 2022

Modification of Reactor Manhole, Hankem Co., Ltd. 

Client: Hankem Co., Ltd.
Service: EPC
Year: 2022

Improvement Work for RS-304, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

Manufacturing of New Filter-Type Concentrator, ENDD Co., Ltd. 

Client: ENDD Co., Ltd.
Service: EPC
Year: 2022

Pump and Instrumentation for Methanol Process, Labsys Korea Co., Ltd. 

Client: Labsys Korea Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Name Plate, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2022

Shaft Support Modification and Related Works, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022

Replacement of Bottom Shaft Support for R-1201 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

Methanol Process Project, BioFriends Co., Ltd. 

Client: BioFriends Co., Ltd.
Service: EPC
Year: 2022

 Saemangeum New Project, Flowon Co., Ltd. 

Client: Flowon Co., Ltd.
Service: EPC
Year: 2022

Repair Work for Shaft Vibration of SR-202 Reactor, SFC Co., Ltd. 

Client: SFC Co., Ltd.
Service: EPC
Year: 2022

Cavic Marine & Offshore HEMT Reactor Pressure Test Work 

Client : Cavic Marine & Offshore
Service: EPC
Year: 2022

Supplementary Work for Vacuum System, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Bottom Pad Flange for R6-701 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

Installation Work of Emission Reduction Facility for Coating Plant, Shinhan Heavy Industries Co., Ltd. 

Client: Shinhan Heavy Industries Co., Ltd.
Service: EPC
Year: 2022

Modification Work for WR-180, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2022

Manufacturing and Installation of Tanks for H-PROJECT, Enchem Co., Ltd.  

Client: Enchem Co., Ltd.
Service: EPC
Year: 2022

Replacement of Mechanical Seal for R-101 Reactor and Related Works, Heesung Catalysts Co., Ltd. 

Client: Heesung Catalysts Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Inner Coil for R-311AB, Samyang Precision Chemical Co., Ltd. 

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Electric Heater, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2022

PLC Control System Work for High-Viscosity Combination Mixer & Press Equipment, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021

Supply of PH Sensor, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2021

Mechanical Seal Repair, Replacement, and Related Works, CSIM Co., Ltd. 

Client: CSIM Co., Ltd. 
Service: EPC
Year: 2021

300 Process Modification Work, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021

Modification Work for Reactor Drive System of Insulation Line No. 2, LG Hausys Co., Ltd. 

Client: LG Hausys Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Mechanical Seal, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2021

Pre-Operation Inspection Work for Reactor, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2021

Supplementary Work for T-PROJECT, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021

Replacement Work of Bag Filter Pulse PCB, Yooyoung Materials Co., Ltd. 

Client: Yooyoung Materials Co., Ltd.
Service: EPC
Year: 2021

Replacement of Bottom Valve, Sangwon Chem Co., Ltd. 

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year: 2021

Repair and Replacement Work of Motor & Reducer and Related Works, LG Hausys Co., Ltd. 

Client: LG Hausys Co., Ltd.
Service: EPC
Year: 2021

Modification Work for Fluidized Bed Dryer, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of TPC Carrier Drum, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021

Replacement Work of Lip Seal (SR-160), CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of New Lab Receiver Body, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Hot Oil Valve, Sewon Chemical Co., Ltd. 

Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2021

Repair Work for Internal Corrosion of R-1201 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

Manufacturing and Installation of STS Reactors and Cosmetic Purification System Equipment, FTC Korea Co., Ltd. 

Client: FTC Korea Co., Ltd.
Service: EPC
Year: 2021

Wood Screw Fabrication for SK Chemical Project, Youngil Engineering Co., Ltd.  

Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2021

Coal Screw Fabrication for SK Chemical Project, Youngil Engineering Co., Ltd.  

Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2021

B-Project (Chemical Business Division), Pharmicell Co., Ltd.  

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Portable Pump Frame and Related Works, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2021

A-Line Screw Feeder (2 Sets) Fabrication and Replacement, SUMaterials Co., Ltd. 

Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Lip Seals (SR-160, SR-220), CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021

Additional Electrical Panel Work and Related Works, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Condenser, Taesung Environmental Research Institute Co., Ltd. 

Client: Taesung Environmental Research Institute Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Lip Seal, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Silo Bridge Breaker, SK Chemical Co., Ltd. 

Client: SK Chemical Co., Ltd.
Service: EPC
Year: 2021

Installation of New Equipment and Related Works, RAIENT Co., Ltd. 

Client: RAIENT Co., Ltd.
Service: EPC
Year: 2021

Bag Filter (260 m³/min) Fabrication and Installation and Related Works, Cosmo Chemical Co., Ltd. 

Client: Cosmo Chemical Co., Ltd.
Service: EPC
Year: 2021

LION Project Execution, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2021

Drum Cleaning System Fabrication (Export to USA), Enchem Co., Ltd. 

Client: Enchem Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Hot Oil Tank and Related Works, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021

New Reactor Project (4.5㎥ Reactor Part), Korea Research Institute of Chemical Technology 

발주처 : 한국화학연구원
Service: EPC
Year: 2021

Heat Exchanger (Condenser) Fabrication and Delivery, Pharmicell Co., Ltd. Chemical Business Division 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Impeller Bolts for R-L304 and R-L305, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

Repair Work of Rotary Evaporative Vacuum Dryer, Samyang Precision Chemical Co., Ltd. 

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of New Spare Shaft for R-1501 CL2 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

2 m³ Reactor and Utility Equipment – New Reactor Project, Wedel Materials Co., Ltd. 

Client: Wedel Materials Co., Ltd.
Service: EPC
Year: 2021

NMP Recovery System Utility Work, Shin Sung ENG Co., Ltd. 

Client: Shin Sung ENG Co., Ltd.
Service: EPC
Year: 2021

Modification Work of Utility Piping for Plant 1, WEMAS Co., Ltd. 

Client: WEMAS Co., Ltd.
Service: EPC
Year: 2021

Reactor Modification Work at Gwangyang Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2021

Installation of 10 m³ and 0.6 m³ Polyol Tanks for Foaming Area and Related Works, Korea Carbon Co., Ltd. 

Client: Korea Carbon Co., Ltd.
Service: EPC
Year: 2021

Reactor & Vessel Head and Water Tank Fabrication for SUM C Project, Samsung Engineering Co., Ltd. 

Client: Samsung Engineering Co., Ltd.
Service: EPC
Year: 2021

Machinery & Equipment Supply for New Plant Construction (Goesan Plant), LS Chem Co., Ltd. 

Client: LS Chem Co., Ltd. 
Service: EPC
Year: 2021

Soil Contamination Assessment (NMP Storage Tank), Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Heat Exchanger and Drum for New Plant Construction at Onsan Plant, NH Chemical Co., Ltd. 

Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Reactor and Vessel for New Plant Construction at Onsan Plant, NH Chemical Co., Ltd. 

Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021

S&T Heat Exchanger for R Project, Korea Petroleum Industrial Co., Ltd., Fields Engineering Co., Ltd. 

Fields Engineering Co., Ltd.
Service: EPC
Year: 2021

 R Project Pressure Vessel, Korea Petroleum Industrial Co., Ltd., Fields Engineering Co., Ltd. 

Fields Engineering Co., Ltd.
Service: EPC
Year: 2021

R-1501 CL2 Reactor Shaft Machining and Related Works, Nica Korea Co., Ltd. 

Fields Engineering Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Lip Seal (SR-160), CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020

Shaft Modification of Pre-Dispersion Mixer No. 2 & 3 (LGCNA), LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Lip Seal, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020

Blower Motor Replacement and Installation Work, Giant Chemical Co., Ltd. 

Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020

Non-Destructive Testing (NDT) of Hazardous and Toxic Chemical Piping, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2020

Additional Construction Work for Vessel (Group B) under M1 Project, Ulsan Plant, Taekwang Industrial Co., Ltd. 

Client: Taekwang Industrial Co., Ltd.
Service: EPC
Year: 2020

Installation of Grinder Hood at Damyang Recycling Plant, Hansol EME Co., Ltd. 

Client: Hansol EME Co., Ltd.
Service: EPC
Year: 2020

Portable Melting System Fabrication and Delivery and Additional Works, IMC System Co., Ltd. 

Client: IMC System Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Heater, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Level Transmitter, Eco Intech Co., Ltd. 

Client: Eco Intech Co., Ltd.
Service: EPC
Year: 2020

Level Glass and Sight Glass Fabrication, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Heat Exchanger Bundle, Unisol Co., Ltd. 

Client: Unisol Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Reactor Bottom Ball Valve and Related Works, WEMAS Co., Ltd. 

Client: WEMAS Co., Ltd.
Service: EPC
Year: 2020

Level Glass Fabrication, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020

Jacket Plug Valve Replacement Work, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2020

Modification Work for PT Tank Support, Doosan Mecatec Co., Ltd. 

Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2020

Manufacturing of Paddle Impeller, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2020

High-Speed Shaft Replacement Work for Pre-Dispersion Mixer (LG Electronics Production Technology Institute), LG Electronics Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2020

Cyclone Fabrication and Delivery, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2020

Mixing Tank Fabrication and Delivery and Related Works, Shinjin Construction Co., Ltd. 

Client: Shinjin Construction Co., Ltd.
Service: EPC
Year: 2020

Central Chute Fabrication and Delivery, Myungseong Tech Co., Ltd. 

발주처 : 명성테크
Service: EPC
Year: 2020

Wax Separation Tank Fabrication, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2020

Instant Hot Water Heat Exchanger Repair Work at Dangjin Steel Plant, Hyundai Steel Co., Ltd. 

Client: Hyundai Steel Co., Ltd.
Service: EPC
Year: 2020

Reclaimer No. 114 Installation for Raw Material Plant (Boom), POSCO Plantec Co., Ltd. 

Client: POSCO Plantec Co., Ltd.
Service: EPC
Year: 2020

Heat Exchanger Fabrication and Delivery for Oligosaccharide Hydrolysis Process, Jaewon Industrial Co., Ltd.   

Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2020

Wood Silo Screw Fabrication, Youngil Engineering Co., Ltd. 

Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2020

Dissolve Tank Fabrication and Delivery, AcuS Co., Ltd.  

Client: AcuS Co., Ltd.
Service: EPC
Year: 2020

Steam Header Fabrication, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2020

Manufacturing and Installation of LNG Stack, Hansol Papertech Co., Ltd. 

Client: Hansol Papertech Co., Ltd.
Service: EPC
Year: 2020

Quality Improvement of IE-TPU Belt and Silo Relocation Project, DongSung Corporation Co., Ltd. 

Client: DongSung Corporation Co., Ltd.
Service: EPC
Year: 2020

Manufacturing and Installation of 10 m³ Reactor, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2020

Reactor Demolition and New Reactor Fabrication & Installation and Related Works, Sewon Chemical Co., Ltd. 

Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2020

Portable Thinner Packing System Fabrication, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2020

Planned Maintenance Work for Heat Exchangers in Preparation for 2020 Energy Inspection, Hyundai Steel Co., Ltd. 

Client: Hyundai Steel Co., Ltd.
Service: EPC
Year: 2020

High-Viscosity Combination Mixer & Press Equipment Installation Work, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2020

MC & WAX Regeneration System (WCP-5,6) Evaporator and Heat Exchanger Fabrication, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020

Hungary Project, Dongwha Electrolyte Co., Ltd. 

Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020

MS Heat Exchanger and Turbine Aftercooler Fabrication and Delivery, Hyundai Rotem Co., Ltd. 

Client: Hyundai Rotem Co., Ltd.
Service: EPC
Year: 2020

200L PE Tank Weighing System Fabrication, Samyoung Sunhwa Co., Ltd. 

Client: Samyoung Sunhwa Co., Ltd.
Service: EPC
Year: 2020

Ion Exchange Fiber Tank Fabrication and Installation Work, Samyang Precision Chemical Co., Ltd. 

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2020

Column (0.56 m³) Fabrication and Installation and Related Works, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2020

FGD Wastewater Treatment Plant Project, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2020

MC Storage Tanks (50 m³, 3 Units) Fabrication and Installation, WPC Co., Ltd. 

Client: WPC Co., Ltd.
Service: EPC
Year: 2020

Fluidized Bed Dryer Installation Work, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2020

Fin-Tube Type Heat Exchangers (4 Units) Fabrication for Yeosu CNT Project, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2020

Mobile Stair Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2020

Portable Melting System Fabrication and Delivery, Samyoung Sunhwa Co., Ltd. 

발주처 : 삼영순화
Service: EPC
Year: 2020

Internal Repair Work for Reactor [RH-02], DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2019

Desuperheater Water Storage Tank Additional Fabrication, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

New AC Plant (Phase 2) and Additional Works, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019

Jacket Ball Valve Replacement Work, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019

Raw Material Double Piping System Repair Work, MNB Greener’s Co., Ltd.  

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019

Co-Precipitation Tank Foreign Material Catcher Installation, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019

Dock System Fabrication and Installation, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

COP-P Reactor (3 m³) Agitator Part Replacement Work, POSCO Chemical Co., Ltd. 

Client : POSCO CHEMICAL
Service: EPC
Year: 2019

Installation of Component Storage Tanks and Related Additional Works, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

POSCO CHEMICAL COP-1 Agitating Tank Overhaul Work (2차) 

Client : POSCO CHEMICAL
Service: EPC
Year: 2019

LG HAUSYS PFA Hopper Modification 

Client : LG HAUSYS
Service: EPC
Year: 2019

Chamber Lift Repair Work for Existing Facility, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2019

Replacement Work of Motor & Reducer, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019

Reactor Manhole Modification Work (5 Units), Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019

Bracket Fixing of Reactor and Non-Destructive Testing (NDT) for Hazardous Chemical Piping, Daesong Precision Chemical Co., Ltd. 

Client: Daesong Precision Chemical Co., Ltd.
Service: EPC
Year: 2019

Motor Specification Change Work for Auxiliary Mixer Units No. 2 & 3 (CAN Electrode), LG Electronics Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2019

COP-1 Agitating Tank Overhaul Work, POSCO Chemical Co., Ltd. 

Client : POSCO CHEMICAL
Service: EPC
Year: 2019

Leaching Facility Additional Works, SeAH M&S Co., Ltd. 

Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2019

Replacement Work of Internal Coil for B-4 Tank, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

Pre-Mixer Fabrication and Installation, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2019

E-1307 Equipment Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019

Replacement Work of Heater, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2019

Piping Modification Work, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

Adhesive Equipment Modification for Existing Production Facility, Hwasung Industries Co., Ltd. 

Client: Hwasung Industries Co., Ltd.
Service: EPC
Year: 2019

Shaft Lower Support Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019

Hot Water Vessel Condensate Downstream Line Insulation Work, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019

Fireproof Coating Work for Production Building, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019

Installation of New Drum Oven, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

Skid Fabrication, Doosan Mecatec Co., Ltd.  

Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2019

COPO1 Initial Tank Installation at Co-Precipitation Building (2F, Gumi Cathode Material Plant), POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019

Skid Fabrication for ExxonMobil Project, Doosan Mecatec Co., Ltd. 

Client: Doosan Mecatec Co., Ltd. 
Service: EPC
Year: 2019

M-Project Execution, Myungil Formtech Co., Ltd. 

Client: Myungil Formtech Co., Ltd.
Service: EPC
Year: 2019

Evaporation Precipitation Reactor Fabrication, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019

Hydrolysis Reactor Fabrication, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019

50 m³ Caustic Soda Storage Tank Fabrication and Installation and Related Works, Dankook Industrial Co., Ltd. 

Client: Dankook Industrial Co., Ltd.
Service: EPC
Year: 2019

Desuperheater Water Storage Tank Fabrication, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

M1 Project Vessel (Group B) Fabrication, Taekwang Industrial Co., Ltd. 

발주처 : 태광산업㈜
Service: EPC
Year: 2019

Transfer Car Fabrication and Delivery for Shinseocheon Thermal Power Plant, Chosun Refractories Engineering Co., Ltd. 

Client: Chosun Refractories Engineering Co., Ltd.
Service: EPC
Year: 2019

Reactor (12 m³) Fabrication and Installation and Related Works, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2019

NGHI SON 2 BOT Thermal Power Plant Project Execution, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

Vacuum Evaporation Reactor Fabrication, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019

Condenser (45 m², 2 Units) Fabrication and Installation, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2019

Condenser Channel Part Replacement Work, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2019

Installation Work of Foundation Plate for Silo & Storage Tank, WCP Co., Ltd. 

Client : WCP Co., Ltd.
Service: EPC
Year: 2019

Trailer & Tripper Frame Assembly Fabrication, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

New Indoor Hazardous Materials Storage Facility Construction and Storage Tank Fabrication & Installation, Ceres F&D Co., Ltd. 

Client: Ceres F&D Co., Ltd.
Service: EPC
Year: 2019

High-Temperature Reactor (5 m³) Project, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2019

Steam Header Fabrication for CP03 & CP04 Lines, WCP Co., Ltd. 

Client : WCP Co., Ltd.
Service: EPC
Year: 2019

HWASEUNG CHEMICAL VIETNAM REACTOR 3M3 PROJECT (VIETNAM) 

Client: Hwasung Chemical Vietnam Co., Ltd.
Service: EPC
Year: 2019

Reactor & Tank (316) Fabrication and Installation, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2019

CWA Coater Supply Tank Fabrication, LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2019

1.2 m³ Twin Mixer Teflon Coating Work, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2019

C-Feeding System Modification Work, LS-Nikko Copper Inc. 

Client: LS-Nikko Copper Inc.
Service: EPC
Year: 2019

Hazardous Material Transfer Tank Fabrication and Delivery, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2019

COP2 Reactor Motor & Reducer Replacement Work, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

Hot Oil Line Repair Work (RB-L302), Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Safety Valve Replacement Work, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2018

FC Reactor Body Replacement and Related Works, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Sand Filter Media Replacement Work at Air Products Korea 2nd Plant 

Client: Air Products Korea 2nd Plant
Service: EPC
Year: 2018

M-107 Mixer (3 m³) Reducer Replacement Work, Unis Co., Ltd. 

Client : Unis Co., Ltd.
Service: EPC
Year: 2018

Reactor Motor & Reducer Replacement Work and Related Works, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2018

Cooling Air Line Temperature Sensor Installation Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Load Cell Installation Work for Vent Buffer Tank 1 m³ (VBT-200), Woojin Polymer Co., Ltd. 

Client: Woojin Polymer Co., Ltd.
Service: EPC
Year: 2018

Reactor (5 m³) Shaft Sprocket Fabrication and Replacement Work, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2018

Brass Nozzle Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Bag Filter Module Fabrication and Related Works, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Additional Powder Can Fabrication, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Foam Spray System Fabrication, Misan R&C Co., Ltd. 

Client: Misan R&C Co., Ltd.
Service: EPC
Year: 2018

Cooling Water Pump Replacement Work, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2018

Cooling Air Supply Y-Piping Modification Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Cooling Air Line Modification Insulation Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Chiller Water Pump On/Off Panel Fabrication, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Jacket Mixer Body Fabrication and Related Works, Jungwon Engineering Co., Ltd. 

Client: Jungwon Engineering Co., Ltd.
Service: EPC
Year: 2018

Evaporator Fabrication and Related Works, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2018

Receiver Tank Fabrication for Experimental Facility and Related Works, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

Evaporator Modification Work, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2018

Heat Exchanger Fabrication and Installation and Related Works, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2018

MS-Bed Regeneration Heater Improvement and Replacement for Oxygen Plant 14, POSCO Co., Ltd. 

Client : POSCO Co., Ltd.
Service: EPC
Year: 2018

CNA Electrode Line No. 3 Auxiliary Mixer Unit, LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2018

Reactor (7 m³) Fabrication and Installation and Related Works, Sewon Chemical Co., Ltd. 

Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2018

Reactor (4,000 L) Fabrication and Related Works [JMC], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Reactor (2,500 L) Fabrication and Related Works [EMEX Solution], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Reactor Fabrication and Related Works [Miwon Commercial], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Pilot Reactor Modification Work, AK Chemtech Co., Ltd. 

Client: AK Chemtech Co., Ltd.
Service: EPC
Year: 2018

5 m³ Mixer Plant Fabrication, Hera Industry Co., Ltd. 

Client: Hera Industry Co., Ltd.
Service: EPC
Year: 2018

Reactor Bare Vessel Fabrication and Related Works [Sunjin Beauty Science], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

MC Storage Tanks (50 m³) Fabrication and Installation, WCP Co., Ltd. 

Client : WCP Co., Ltd.
Service: EPC
Year: 2018

High-Temperature Reactor (5 m³) Fabrication and Related Works, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2018

Vessel and Filter Components for Plant Expansion Project (Gwangyang Site), POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

Leaching FRP Facility Installation Work, SeAH M&S Co., Ltd. 

Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2018

2,000 L G/L Reactor Fabrication for Sambo Precision Chemical, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

1,000 L Reactor Fabrication and Related Works for Woojin Polymer, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

10,000 L Reactor Fabrication and Related Works for Cheonbo & Miwon Commercial, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Reboiler Fabrication and Related Works, Jaewon Industrial Co., Ltd. 

Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2018

WJF Project – 3rd Class Production Facility and Two Storage Tanks Fabrication and Installation, Wisol Co., Ltd. 

Client: Wisol Co., Ltd.
Service: EPC
Year: 2018

Cylindrical Reformer Fabrication (100 Units), S-Fuelcell Co., Ltd. 

Client: S-Fuelcell Co., Ltd.
Service: EPC
Year: 2018

Manufacturing and Installation of 15.5 m³ Storage Tank, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2018

Replacement Work of Hoist, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

3,000 L Reactor Fabrication for Garam Nano, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

CE-8000 and 20,000 L Reactor Fabrication (Cost-Based Work) for Dongyang, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

10 m³ Bromine Receiver Bare Vessel Fabrication, Dongyang Industry Co., Ltd. 

Client: Dongyang Industry Co., Ltd.
Service: EPC
Year: 2018

ROI Reactor (10 m³) Replacement and Related Works, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

COP-P PP Building Reactor (10 m³) Expansion Project, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

COP-1 MP1 Modification Work, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

25 m³ G/L Reactor Bare Vessel Fabrication and Related Works, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Heat Recovery System for Biopharmaceutical Manufacturing Process, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2018

Diaphragm Pump Replacement and Related Works, Segye Chemical Co., Ltd. 

Client: Segye Chemical Co., Ltd.
Service: EPC
Year: 2018

Heat Exchanger Fabrication, Scandinavian Biogas Korea Co., Ltd. 

Client: Scandinavian Biogas Korea Co., Ltd.
Service: EPC
Year: 2018

Modification Work of Heat Exchanger, Jaewon Industrial Co., Ltd. 

Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2018

Reactor (6 m³) Fabrication and Related Works, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2018

Reactor (10 m³) Fabrication and Related Works, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Cyclopentane Storage Tank Plant (30 m³) Fabrication and Related Works, Gana IS Co., Ltd. 

Client: Gana IS Co., Ltd.
Service: EPC
Year: 2018

Reactor Modification Work, Mecapoly Co., Ltd. 

Client: Mecapoly Co., Ltd.
Service: EPC
Year: 2018

Foam Spray System Fabrication, Hanjoong Yuhwa Co., Ltd. 

Client: Hanjoong Yuhwa Co., Ltd.
Service: EPC
Year: 2018

Reactor (0.8 m³) Replacement Work, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2018