Pilot Plant

We have developed pilot plants that verify process conditions at the pre-commercial stage and ensure scalability for full-scale production.

ㆍ Construction of Pilot Plant for Process Verification
ㆍ Design and Manufacturing of Pilot Equipment
ㆍ Pilot Project for Commercialization Validation
ㆍ Construction of Pilot Plant for Test-Based Process Validation


At low cost and small scale, it enables early detection of potential issues that may occur in actual equipment.
It can also be used for experimental testing in new process development.
Pilot processes are used to develop and validate new products and production processes by collecting data required
for clinical trials and commercial production, and confirming stability and performance.

As demand for environmental protection and sustainability increases, it plays a key role 파일럿 공정은 친환경 필연적 주요 항목으로써,
in product and process development, minimizing environmental impact and enhancing business sustainability.

wintech pilot plant 1
wintech pilot equipment 1
Manufacturing of Pilot 500L Agitator, Dongin Chemical Co., Ltd. 

Client: Dongin Chemical Co., Ltd.
Service: EPC
Year: 2025

Manufacturing of Pilot Distillation Column, Dongsin Chemical Co., Ltd. 

Client: Dongsin Chemical Co., Ltd.
Service: EPC
Year: 2025

Repair and Replacement of Components for Existing Pilot 5L Equipment, Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Installation Work of Safety System for Pilot Plant at Daejeon Research Institute, Aekyung Chemical Co., Ltd. 

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Installation Work of Hydrogenation Pilot Facility in PP Building at Daejeon Research Institute, Aekyung Chemical Co., Ltd. 

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Supply of Steam Generator Equipment for Polyol Pilot 300L, Aekyung Chemical Co., Ltd. 

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Modification Work for Existing Pilot 5L Equipment, Aekyung Chemical Co., Ltd. 

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2024

Supply of Vacuum Pump Spare Part for Pilot Reactor Project, Samyang Corporation 

Client: Samyang Corporation 
Service: EPC
Year: 2024

Supply of Hot Oil Pump Spare Part for Pilot Reactor Project, Samyang Corporation

Client: Samyang Corporation
Service: EPC
Year: 2024

Installation Work for Explosion-Proof Modification and Relocation of 70L Pilot Manufacturing Facility (Including 150L Pilot Process Equipment), Aekyung Chemical Co., Ltd. 

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2024

 Repair of Pilot Reactor, Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2024

Pilot System Revamping Work, Songwoo EM Co., Ltd. (Elbus Materials) 

Client: Songwoo EM Co., Ltd.
Service: EPC
Year: 2023

Decommissioning Work of 200L Pilot Reactor System, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2022

Improvement Work for TPC Pilot Facility, Lotte Fine Chemical Co., Ltd.

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2022

Manufacturing of 5L Pilot Reactor System, Pierita Co., Ltd. 

Client: Pierita Co., Ltd.
Service: EPC
Year: 2022

KEZE NOVEL MATERIALS Keze Pilot Reactor 50L Package 

Client: KEZE Novel Materials
Service: EPC
Year: 2022

Installation of Melt Reaction Pilot Facility for Biodegradable PC Production, Samyang Corporation 

Client: Samyang Corporation
Service: EPC
Year: 2022

Test Concentrator Fabrication for END Co., Ltd. 

Client: ENDD Co., Ltd.
Service: EPC
Year: 2022

Pilot System for ELBES Materials Co., Ltd. 

Client : ELBES Materials Co., Ltd.
Service: EPC
Year: 2022

Pilot System – Ribbon Dryer Part for ELBES Materials Co., Ltd. 

Client : ELBES Materials Co., Ltd.
Service: EPC
Year: 2022

Pilot System – Dip Nozzle Part for ELBES Materials Co., Ltd. 

Client : ELBES Materials Co., Ltd.
Service: EPC
Year: 2022

Pilot Dryer System Fabrication for ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022

Improvement Work for TPC Pilot Facility, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2022

Pilot Reactor Package for UNIS Co., Ltd. 

Client: UNIS Co., Ltd.
Service: EPC
Year: 2021

Pilot Blanket System – Additional Pump Installation for Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021

Pilot Plant for JK Metal Materials Co., Ltd. 

Client: JK Metal Materials Co., Ltd.
Service: EPC
Year: 2021

Pilot Mixer System for AK ChemTech Co., Ltd. 

Client: AK ChemTech Co., Ltd.
Service: EPC
Year: 2021

150L Pilot Reactor Modification for LS Chem Co., Ltd. 

Client: LS Chem Co., Ltd.
Service: EPC
Year: 2021

75L Pilot Mixer Plant for Arlink Co., Ltd. 

Client: Arlink Co., Ltd.
Service: EPC
Year: 2020

30L Pilot Reactor System for DRB Dongil Co., Ltd. 

Client: DRB Dongil Co., Ltd.
Service: EPC
Year: 2020

TPC Pilot Package for Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2020

5L Pilot Reactor System for AK ChemTech Co., Ltd. 

Client: AK ChemTech Co., Ltd.
Service: EPC
Year: 2020

Pilot Reactor Modification and Associated Works for KG Chemical Co., Ltd. 

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2019

200L Pilot Reactor Plant – Additional Construction Work for Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2019

Blanket Pilot System Fabrication and Installation for Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2019

200L Pilot Reactor Plant for Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2018

RIST Column Pilot System 

Client: RIST
Service: EPC
Year: 2018