Environment

beautiful summer landscape savsat artvin province turkey

WINTECH Environmental Business Division provides customer-oriented, one-stop integrated solutions covering engineering, procurement, construction (EPC),
comprehensive environmental permitting, and chemical/HSE consulting.

Eco-Friendly Process Design & Reliable Construction

Amid increasingly stringent environmental regulations and the growing challenges of climate change, we support corporate sustainability (ESG)
and
ensure environmental compliance through optimized emission reduction technologies and high-efficiency pollution control engineering.

Expertise in HSE Permitting & Regulatory Compliance

From preparing Chemical Accident Prevention Management Plans (CAPMP), conducting safety inspections, and providing MSDS documentation services to handling permits
and regulatory filings for air and water emission facilities under complex environmental regulations, we provide end-to-end support that minimizes regulatory risks and
ensures full compliance.

3464 1

Six Core Environmental Solution Areas

We design and fabricate high-performance, high-efficiency systems that integrate particulate matter (PM10 and PM2.5)
collection technologies with advanced hazardous gas emission control solutions.
Delivering reliable operation that goes beyond regulatory compliance.

We provide end-to-end services for advanced wastewater treatment and water reuse facilities —from planning
and engineering of physicochemical and biological treatment processes (MBR, SBR) to equipment procurement
and flawless turnkey construction.

From detailed engineering (E), raw material and equipment procurement (P), and civil, structural steel,
and building construction (C) to commissioning, we successfully deliver
total turnkey environmental plant projects.

We provide comprehensive permitting services, including approvals and registrations for air and water emission facilities, noise and vibration source assessments, and
coordination of building permits—ensuring complete regulatory documentation and
efficient approval processes.

We provide prompt preparation of Material Safety Data Sheets (MSDS), support for registration through the Waste Chemical Management System (WCMS),
and comprehensive reviews of chemical substances for regulatory compliance.

We provide PSM (Process Safety Management), SMS (Safety Management System) documentation, quantitative risk assessments (HAZOP/PHA),
and occupational HSE consulting to help clients achieve
a zero-incident workplace through proactive risk management.

플랜트 EPC 구축 프로세스 및 엔지니어링 절차

Technical & Regulatory Review

Analysis of Exhaust Gas & Wastewater Composition, Chemical Regulatory Compliance Review, and Preliminary Technical Solution Assessment

Basic Design

Material Balance & Flow Rate Design, and Preparation of Initial Drafts of Process Flow Diagrams (PFDs) and Piping & Instrumentation Diagrams (P&IDs)

Detail Design

Finalization of Instrumentation Specifications, Completion of P&ID Approval, 3D Structural Modeling, and Preparation of Documents for Submission to Regulatory Authorities

Fabrication and Construction Works

Manage standardized fabrication processes and conduct rigorous Factory Acceptance Testing (FAT), followed by complete on-site installation and structural steel erection.

Comprehensive Commissioning & Handover

Performance verification through pre-commissioning and integrated no-load/load commissioning, followed by completion of the client's operational start-up notification.

High-Performance Core Environmental Protection Equipment Lineup

A high-efficiency dust collector that removes particulate pollutants from the air through filtration media, utilizing a high-speed pulse-jet cleaning system
to maintain stable differential pressure.

TECHNICAL ADVANTAGE

Maximized Collection of PM10 and PM2.5 Fine Particles

Guaranteed Stable Differential Pressure and Optimized Filter Bag Life

PTFE Special-Coated Filters for High-Temperature and Acid-Resistant Applications

A hybrid air pollution control system that utilizes gas absorption and wet scrubbing principles to efficiently remove acidic gases, odorous compounds,
and particulate matter from exhaust gases through simultaneous wet treatment.

TECHNICAL ADVANTAGE

High-Efficiency Hybrid Removal of Gaseous and Particulate Pollutants

Special Packing Design for Maximized Gas–Liquid Contact Area

Automated Control System for Acidic and Alkaline Reactive Gases

Employs a physically and chemically activated carbon bed with a highly developed pore structure to adsorb volatile organic compounds (VOCs)
and odorous substances, effectively controlling atmospheric emissions at the source.

TECHNICAL ADVANTAGE

VOCs 및 유기 용제 가스 99% 흡착 제어

흡착제 충진 교체 주기 극대화 실현

내부 기류 유량 균일 분포 분산판 적용

공장 생산 라인에서 배출되는 난분해성 폐수를 고도의
생물학적 처리 공정(MBR/SBR) 및 최적 중화 처리로 수질 기준에 부합하게 정화합니다.

TECHNICAL ADVANTAGE

MBR 중공사막 필터 공법 적용 고도 질소 처리

부하 변동 대응 자동 컨트롤 센싱 배관 구성

화학 응집 침전 고형물 완전 자동화 여과 처리

HSE & Chemical Regulatory Compliance Consulting


Chemical Accident Prevention


MSDS & WCMS


PSM & SMS Risk Assessment


Risk Assessment Support

Committed to Clean Environmental Plant Solutions,

tree
Activated Carbon Tower Fabrication and Installation for Bio-U Project, KG Chemical Co., Ltd. 

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025

Global Battery Materials Corp. Vacuum Belt Filter System_Revamping 

Client : Global Battery Materials Corp.
Service: EPC
Year: 2025

Performance Diagnosis of Air Pollution Control Facilities and Duct Improvement Design for SeAH M&S Co., Ltd. 

Client : SeAH M&S Co., Ltd.
Service: EPC
Year: 2025

A/C Tower (2 Sets) Fabrication and Supply for Dongyang Plant Co., Ltd. 

Client : Dongyang Plant Co., Ltd.
Service: EPC
Year: 2025

Environmental Facility Improvement Work for A-Project at Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2025

Supply of Instruments for Waste Heat Recovery Unit (WHRU)  

Client: Labsys ENG Co., Ltd.
Service: EPC
Year: 2025

Fabrication and Installation of FRP Scrubber for Gongju Plant 

Client : Dongin Chemical Co., Ltd. : EPC
Year: 2025

Portable Pump & Filter Unit Supply  

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year: 2025

Installation of Magnetic Filter and N₂ Area Flow Meter for Gwangyang Precursor Plant Phase 2 

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

Kyungdong E&S Co., Ltd. KDTT K2 Project Scrubber 

Client : Kyungdong E&S Co., Ltd.
Service: EPC
Year: 2025

Bag Filter Lower Dust Hopper Installation (2 Sets), SeAH M&S Co., Ltd. 

Client : SeAH M&S Co., Ltd.
Service: EPC
Year: 2025

Gyeoldong Mobile Dust Collector Installation and Related Works, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2024

Filter Line Modification Work, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2025

Scrubber Fabrication and Installation and Related Works, Kolon Life Science Co., Ltd. 

Client: Kolon Life Science Co., Ltd.
Service: EPC
Year: 2024

Bag Filter Fabrication and Installation for Dismantling Area, SeAH M&S Co., Ltd. 

Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2024

Wastewater Treatment Plant Equipment Fabrication, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2024

Paint Booth and Adsorption Tower Fabrication and Installation for Eco Land Project, Ains Co., Ltd. 

Client: Ains Co., Ltd.
Service: EPC
Year: 2024

Existing Scrubber Modification Work, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2023

Scrubber (10 CMM) Fabrication and Installation, PSG Co., Ltd. 

Client : ㈜PSG
Service: EPC
Year: 2023

National R&D Project for Net-Zero Demand Management, WooYang H&C Co., Ltd. 

Client: WooYang H&C Co., Ltd.
Service: EPC
Year: 2022

AC Tower (100 CMM) Modification Work, Daeshin Metal Co., Ltd. 

Client: Daeshin Metal Co., Ltd.
Service: EPC
Year: 2022

Manufacturing and Installation of AC Tower (37 CMM), Korea Petroleum Industrial Co., Ltd. 

Client: Korea Petroleum Industrial Co., Ltd.
Service: EPC
Year: 2022

Installation Work of Printing and Adsorption Tower, IC Max Co., Ltd. 

Client: IC Max Co., Ltd.
Service: EPC
Year: 2022

AC Tower (100 CMM) Modification Work, Youngshin TR (GSE) Co., Ltd. 

Client: Youngshin TR Co., Ltd.
Service: EPC
Year: 2022

AC Tower (500 CMM) Fabrication and Installation including Water Supply Piping, Seojin T&A Co., Ltd. 

Client: Seojin T&A Co., Ltd.
Service: EPC
Year: 2022

Scrubber and AC Tower Fabrication and Installation, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2022

AC Tower Fabrication and Installation, Pharmicell Co., Ltd.

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2022

FC Plant Chemical Control Act (Hazardous Chemicals Regulation) Compliance Work, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

AC Tower (110 CMM) Fabrication and Installation for Central Research Institute, Aekyung Petrochemical Co., Ltd. 

Client: Aekyung Petrochemical Co., Ltd. Central Research Institute
Service: EPC
Year: 2021

AC Tower (40 CMM) Fabrication and Installation, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021

AC Tower (1250 CMM) Fabrication and Installation and Related Works, Aekyung Petrochemical Co., Ltd.  

Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2021

SC-901 Scrubber Fabrication for E-P Project, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2021

Adsorption Tower Design for Exhaust Gas Treatment (P-7 Project), Aekyung Petrochemical Co., Ltd. 

Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2021

Scrubber Repair Work, Daehospecial Steel Co., Ltd. 

Client: Daehospecial Steel Co., Ltd.
Service: EPC
Year: 2021

Wet Scrubber (450 CMM) Fabrication and Installation, NH Chemical Co., Ltd. 

Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021

AC Tower (100 CMM) Fabrication and Installation, Seyang Lube Co., Ltd. 

Client: Seyang Lube Co., Ltd.
Service: EPC
Year: 2021

 EO Tank System Environmental Facility Fabrication and Installation (E-P Project), KPX Chemical Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021

SUMaterials㈜ Dust Collector Maintenance 

Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2021

Research Reactor Wastewater Treatment System, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2020

AC Tower Replacement (Unit 1) at Nonsan Plant, Dongwha Electrolyte Co., Ltd. 

Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020

Scrubber Fabrication and Installation for NMP Plant (Hungary), Dongwha Electrolyte Co., Ltd. 

Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020

Bag Filter Fabrication and Installation, Giant Chemical Co., Ltd. 

Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020

Air Pollution Control Facility Manufacturing and Duct Installation for New Plant, Terrawin Printing Co., Ltd. 

발주처 : (주)테라윈프린팅
Service: EPC
Year: 2020

Wet Scrubber and Ash Tower Fabrication, SK Chemical Co., Ltd. 

SK Chemical Co., Ltd.
Service: EPC
Year: 2020

Air Pollution Control Facility and IoT System Installation Work, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2020

Air Pollution Control Facility and IoT System Installation Work, Woorim Heat Treatment Co., Ltd.  

Client: Woorim Heat Treatment Co., Ltd.
Service: EPC
Year: 2020

AC Tower (80 CMM, Portable Type) Fabrication, Giant Chemical Co., Ltd. 

Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020

AC Tower and Wet Scrubber Environmental Facility (145 CMM) Fabrication and Installation, Korea SanNopco Co., Ltd. 

Client: Korea SanNopco Co., Ltd.
Service: EPC
Year: 2020

AC Tower (70 CMM) Fabrication and Installation and Related Works, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020

Environmental Facility (100 CMM) Fabrication and Installation with 3-Stage Treatment System (Filtration, Adsorption, Scrubbing), Sein ENG Co., Ltd. 

Client: Sein ENG Co., Ltd
Service: EPC
Year: 2020

Dust Collector Pulse Valve Replacement and Related Works, SUMaterials Co., Ltd. 

Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2019

Bag Filter and Cartridge Filter Fabrication and Delivery, WEMAS Co., Ltd. 

Client: WEMAS Co., Ltd.
Service: EPC
Year: 2019

Filtration Dust Collector Stack Modification (40 CMM), SM Plantec Co., Ltd. 

Client: SM Plantec Co., Ltd.
Service: EPC
Year: 2019

AC Tower (70 CMM) Fabrication and Installation and Related Works, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2019

Adsorption Tower (70 CMM) Fabrication and Installation, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2019

Environmental Facility Improvement Work at Board Chemical Plant (Formaldehyde Absorption Tower), Dongwha Enterprise Co., Ltd. 

Client: Dongwha Enterprise Co., Ltd.
Service: EPC
Year: 2019

AC Tower (60 CMM) Fabrication and Installation, Portrex Chemical Co., Ltd. 

Client: Portrex Chemical Co., Ltd.
Service: EPC
Year: 2019

Filtration Dust Collector (40 CMM) Fabrication and Installation, SM Plantec Co., Ltd. 

Client: SM Plantec Co., Ltd.
Service: EPC
Year: 2019

Filtration Dust Collection System Installation for Primary Calcination Furnace (Jeonju Plant), Aekyung Petrochemical Co., Ltd. 

Client: Aekyung Petrochemical Co., Ltd.
Service: EPC
Year: 2019

Scrubber Fabrication for E-REF-15 Project, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2019

Cyclone Vortex Finder Fabrication, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Bag Filter Hydraulic Ram Replacement Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Neutralization Scrubber Fabrication and Replacement Work, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Vessel and Filter Components for Plant Expansion Project (Gwangyang Site), POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

A/C Filter Fabrication and Installation, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

AC Tower (250 CMM) Fabrication and Installation, Korea Petrochemical Ind. Co., Ltd. 

Client: Korea Petrochemical Ind. Co., Ltd.
Service: EPC
Year: 2018

Adsorption Tower (30 CMM) Fabrication and Installation, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2018

Mechanical Equipment Performance Improvement Work for Wastewater & FGD Wastewater System (Hadong Thermal Power Plant), Coway Entech Co., Ltd. 

Client: Coway Entech Co., Ltd.
Service: EPC
Year: 2018

New AC Plant Project, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Scrubber Fabrication and Installation for PNS Dryer, KG Chemical Co., Ltd. 

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2018

Vacuum Line Cartridge Filter Installation, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2018