ChemicalGas · Powder

Through our experience in chemical plant construction focused on reaction and mixing processes, we have secured process stability and operational reliability.

• Chemical Process Plant Engineering & Construction Projects
• Chemical Plant Execution including Reactors and Agitators
• Fine Chemical Process EPC Projects
• Chemical Plant Fabrication & Construction Experience


REACTOR

HEAT EXCHANGER

MIXER

STORAGE TANK

DISSOLVER

DISTILLATION COLUMN

DEAERATOR

FITRATION SYSTEM

PRESSURE VESSEL

PIPING

STRUCTURE

AUTOMATIC CONTROL SYSTEM
자동화 시스템

Slurry Batch Post-Treatment System for Aekyung Chemical Co., Ltd. Daejeon Research Institute

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Leak Test of Two Existing Heat Exchangers for Zeus Petrochemical Co., Ltd.

Client: Zeus Petrochemical Co., Ltd.
Service: EPC
Year: 2025

Inline Homo Mixer System for HC Plant, Nica Korea Co., Ltd.

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025

Repair of Pilot 70L Band Heater for Aekyung Chemical Co., Ltd. Daejeon Research Institute

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Repair Work of SC-1501 Scrubber for Nica Korea Co., Ltd.

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025

Repair Work of SC-1501 Scrubber for Nica Korea Co., Ltd.

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025

Leak Repair Work of Existing R-202 Reactor for Hankem Co., Ltd.

Client: Hankem Co., Ltd.
Service: EPC
Service Period: 2025-12-24

Repair of Si-C DP 50MT Air Compressor for POSCO Future M Co., Ltd. 

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

6PP Granulation Mixer Replacement Project for RIST

Client: Pohang Research Institute of Industrial Science & Technology (RIST)
Service: EPC
Year: 2025

Manufacturing and Delivery of Knock-Out Drum for CNT Project, Enchem Georgia Plant Co., Ltd. 

Client: Enchem Co., Ltd.
Service: EPC
Year: 2025

Heat Exchanger Manufacturing Quotation for Biofuels Project, KG Chemical Co., Ltd.  

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025

Manufacturing of Reactor & Vessel for Biofuels Project, KG Chemical Co., Ltd.  

Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025

Installation of Lube Recutting Plant at Onsan Plant, Zeus Petrochemical Co., Ltd. 

Client: Zeus Petrochemical Co., Ltd.
Service: EPC
Year: 2025

Additional Installation of Plate Type Heat Exchanger for Si-C Project, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

Leak Repair of Mixing Tank Nozzle, Daekwang Industrial Co., Ltd.

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2025

Installation Work of Storage Tank for Building C, 2nd Plant, Sebitchem Co., Ltd.

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025

Manufacturing of Vacuum Receiver Tank and Related Equipment, Songwoo EM Co., Ltd. 

Client: Songwoo EM Co., Ltd.
Service: EPC
Year: 2025

New Reactor Manufacturing, Reactor Replacement, and Air Dryer Installation Project, Hwasung Chemical Co., Ltd. 

Client: Hwasung Chemical Co., Ltd.
Service: EPC
Year: 2025

Additional Side Manhole Installation for Two Wastewater Tanks, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

500L Vacuum Dryer Manufacturing and Existing Equipment Improvement Project, Dongin Chemical Co., Ltd. Pyeongtaek Plant   

Client: Dongin Chemical Co., Ltd.
Service: EPC
Year: 2025

Repair Work of Four Condensers at Buyeo Plant, Dongin Chemical Co., Ltd. 

Client: Dongin Chemical Co., Ltd. 
Service: EPC
Year: 2025

Improvement of Existing 500L Reactor for Heesung Catalysts Co., Ltd.  

Client: Heesung Catalysts Co., Ltd.
Service: EPC
Year: 2025

Belt Conveyor Installation (Hopper & Cyclone Section), KH EcoTech Co., Ltd.  

Client: KH EcoTech Co., Ltd.
Service: EPC
Year: 2025

Manufacturing and Delivery of T-8201 Column for Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025

Steam Trap Replacement Work, Rupax Co., Ltd. 

Client: Rupax Co., Ltd.
Service: EPC
Year: 2025

Fabrication of Two 41CMM AC Towers, Hanyang Industry Co., Ltd. 

Client: Hanyang Industry Co., Ltd.
Service: EPC
Year: 2025

Frozen City Water Piping Response and Air Compressor Repair at Si-C DP City, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025

Vent Ozone Condenser Fabrication, Bando ENT Co., Ltd.  

Client: Bando ENT Co., Ltd.
Service: EPC
Year: 2025

Supply of Materials for Upper Shaft Replacement of R-200 Reactor (1.5㎥), Samyang Precision Chemical Co., Ltd.  

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2025

Suction Tank Fabrication, Sangwon Chem Co., Ltd.  

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024

Repair Work of Si-C Chiller Water Pump, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Delivery of Canvas for Kolon Life Science Co., Ltd.   

Client: Kolon Life Science Co., Ltd.
Service: EPC
Year of Service: 2024

Supply and Delivery of New Band Heaters for Aekyung Chemical Co., Ltd.    

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement of O-Ring for Glass Lined Condenser Tube at Gongju Plant, Dongin Chemical Co., Ltd.  

Client: Dongin Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Improvement Work for SR-160 and WR-140, CS Chemical Co., Ltd.    

Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Installation of Decanter Flowmeter, ABC Nanotech Co., Ltd.    

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Installation of Portable Tank Band Heater, ABC Nanotech Co., Ltd.   

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Correction Work for Shaft Vibration of Reactors No. 2 & 3 at Insulation Plant, LX Hausys Co., Ltd.  

Client: LX Hausys Co., Ltd.
Service: EPC
Year of Service: 2024

Disassembly and Installation of WT-120 Motor & Reducer and Related Works, CS Chemical Co., Ltd.  

Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Supply of LNG High-Pressure Gas Production Facility for BioFriends Co., Ltd.    

Client: BioFriends Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement Work of Wastewater Tank, Sangwon Chem Co., Ltd.   

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Installation of Load Cell Shim Plate and Related Works, POSCO Future M (Hanatech) Co., Ltd.    

Client: POSCO Future M (Hanatech) Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing of Emulsifier System, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Additional Construction Work for LiM X1 Project (MVR Part), 4th Plant, Sebitchem Co., Ltd.    

Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024

 Replacement Work of Condensate Tank V-015 for MVR System, 4th Plant, Sebitchem Co., Ltd.    

Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement Work of Shaft for 3㎥ Mixer at Boryeong Plant, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024

Non-Destructive Testing (NDT) of XYLENE Line, Sangwon Chem Co., Ltd.  

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Installation of Screw Conveyor for 2nd Plant, Sebitchem Co., Ltd.  

Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024

Wastewater Storage Tank Repair, POSCO Future M Co., Ltd.

Client: POSCO Future M Co., Ltd.
Service: EPC
Year of Service: 2024

Hazardous Materials Transport Container Fabrication, G-CHEMS Co., Ltd.   

Client: G-CHEMS Co., Ltd.
Service: EPC
Year of Service: 2024

Repair of Vacuum Pump, Eco Chemical Co., Ltd.  

Client: Eco Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Engineering Service for Expansion Design of BD Distillation Facility at Ulsan Plant, Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing of Canvas, ML Tech Co., Ltd.   

Client: ML Tech Co., Ltd.
Service: EPC
Year of Service: 2024

Chamber Insulation Work for Surface Treatment Equipment (Advanced Materials), Korea Carbon Co., Ltd.  

Client: Korea Carbon Co., Ltd.
Service: EPC
Year of Service: 2024

Repair of N3P-R301 Mechanical Seal, Nica Korea Co., Ltd.   

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

Dehumidification System Fabrication, Hwasung Chemical Co., Ltd. 

Client: Hwasung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Replacement of N3P-R301 Mechanical Seal, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

FC N0 Overhaul Work, Nica Korea Co., Ltd.   

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

30㎥ Methanol Storage Tank Fabrication and Related Works, WooYang H&C Co., Ltd.   

Client: WooYang H&C Co., Ltd.
Service: EPC
Year of Service: 2024

Repair Work of Outdoor Tank at Coating Part, Korea Carbon Co., Ltd. 

Client: Korea Carbon Co., Ltd.
Service: EPC
Year of Service: 2024

Repair Work for Internal Corrosion of R6-701 Reactor, Nica Korea Co., Ltd.  

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

Transfer of 20㎥ Reactor and Electrical Works, Nica Korea Co., Ltd.  

Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024

Storage Tank Fabrication for ED#1 Project, Eco & Dream Co., Ltd.   

Client: Eco & Dream Co., Ltd.
Service: EPC
Year of Service: 2024

SR-160 Lip Seal Replacement and WR-150 Steam Line Maintenance, CS Chemical Co., Ltd.   

Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024

Manufacturing and Delivery of Manhole Spring Jack, Daelim Engineering Co., Ltd. 

Client: Daelim Engineering Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Delivery of Manhole Spring Jack, Daelim Engineering Co., Ltd. 

Client: Daelim Engineering Co., Ltd.
Service: EPC
Year: 2023

Manufacturing of Anchor Impeller, LX Hausys Co., Ltd. 

Client: LX Hausys Co., Ltd.
Service: EPC
Year: 2023

Ultium CAM  p_CAM_Tank (Feed & Storage Vessels, Reactor)  

Client: Ultium CAM
Service: EPC
Year: 2023

Supply and Installation of Concentration System Plant for 4th Plant, Sebitchem Co., Ltd. 

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023

Vacuum Distillation Tower Repair Work at Ulsan Plant, Michang Oil Industrial Co., Ltd. 

Client: Michang Oil Industrial Co., Ltd.
Service: EPC
Year: 2023

Vibrating Screen Fabrication and Installation for 2nd Plant, Sebitchem Co., Ltd.  

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023

Supply and Installation of Ton Bag Breaker System, POSCO Future M Co., Ltd.  

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2023

Paint Booth & Auto Roll Filter Fabrication and Installation, Shinmyeong Entec Co., Ltd.  

Client: Shinmyeong Entec Co., Ltd.
Service: EPC
Year: 2023

MVR Part Additional Installation Work for 2nd Plant, Sebitchem Co., Ltd. 

Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023

Replacement Work of SR-160 Lip Seal, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2023

Installation Work of GCOP-1 Concentration Filter System at Gwangyang Plant, POSCO Future M Co., Ltd. 

Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Installation of 5㎥ Reactor and TCU System, Myungjin Global Co., Ltd.  

Client: Myungjin Global Co., Ltd.
Service: EPC
Year: 2023

EPC Contract for General Handling Permit Related to Chemical Laboratory, Aekyung Chemical Co., Ltd.  

Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2023

Knock-Out Drum Fabrication and Installation, EGIS Co., Ltd. 

Client: EGIS Co., Ltd.
Service: EPC
Year: 2023

Drive System Improvement Work for Reactors No. 3 & 4 (Insulation Plant), Manufacturing & Delivery, LX Hausys Co., Ltd. 

Client: LX Hausys Co., Ltd.
Service: EPC
Year: 2023

20 Nm³/hr DME Hydrogen Reforming System, Labsys Korea Co., Ltd. 

Client: Labsys Korea Co., Ltd.
Service: EPC
Year: 2023

Air Tank and Air Header Installation for Existing Plant, RAIENT Co., Ltd. 

Client: RAIENT Co., Ltd.
Service: EPC
Year: 2023

NAPHTHA Project Skid Fabrication, BioFriends Co., Ltd.  

Client: BioFriends Co., Ltd.
Service: EPC
Year: 2023

Receiver System Fabrication, Mokwoo Research Institute Co., Ltd. 

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

Nutsche Filter Fabrication, Mokwoo Research Institute Co., Ltd.  

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

NaOH Feeding System Fabrication, Mokwoo Research Institute Co., Ltd.  

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

TCU Installation for Cooling Water Tank, Polysis Co., Ltd.  

Client: Polysis Co., Ltd. 
Service: EPC
Year: 2023

MC Wax Regeneration System Fabrication for WHP HP01~04 Line, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2023

Air System Fabrication and Installation, Mokwoo Research Institute Co., Ltd. 

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

Replacement of Glass Lined Reactor Impellers (2 Sets), LS Chem Co., Ltd. 

Client: LS Chem Co., Ltd.
Service: EPC
Year: 2023

Existing Ribbon Mixer Modification Work, ABC Nanotech Co., Ltd.  

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2023

Steam Header Fabrication, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2023

 Vacuum Dryer Fabrication and Installation, Mokwoo Research Institute Co., Ltd. 

Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023

Blower Motor Replacement Work, Sein ENG Co., Ltd. 

Client: Sein ENG Co., Ltd.
Service: EPC
Year: 2023

Pre-Engineering for Base Facilities of Continuous Artificial Graphite Demo Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Installation of SMC Storage Tank, Korea Carbon Co., Ltd. 

Client: Korea Carbon Co., Ltd.
Service: EPC
Year: 2023

Construction of New Liquid Metal Line for Existing COP-3 at Gwangyang Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Manufacturing and Installation of Three MC Storage Tanks, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2023

Replacement of Vacuum Dryer Temperature Sensor, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2023

Procurement of Reactors and Receivers for Phase 2 Expansion Investment of Precursor Plant in Gwangyang, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023

Manufacturing of 5L Pilot Reactor System, Pierita Co., Ltd. 

Client: Pierita Co., Ltd.
Service: EPC
Year: 2022

EP Work for Structural Components of Si-C Anode Material Demo Plant R&D Project, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022

KEZE NOVEL MATERIALS Pilot Reactor 50L Package 

Client: KEZE Novel Materials
Service: EPC
Year: 2022

Manufacturing of Silica Production Plant (150 Ton Capacity), ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022

Procurement of Tanks for Phase 2 Expansion Investment of Precursor Plant (Gwangyang), POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022

Condenser (20㎡) Fabrication, Hwasung Gas Tech Co., Ltd. 

Client: Hwasung Gas Tech Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Existing Bag Filter Bags, Sein ENG Co., Ltd. 

Client: Sein ENG Co., Ltd.
Service: EPC
Year: 2022

Modification of Reactor Manhole, Hankem Co., Ltd. 

Client: Hankem Co., Ltd.
Service: EPC
Year: 2022

Improvement Work for RS-304, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

Manufacturing of New Filter-Type Concentrator, ENDD Co., Ltd. 

Client: ENDD Co., Ltd.
Service: EPC
Year: 2022

Pump and Instrumentation for Methanol Process, Labsys Korea Co., Ltd. 

Client: Labsys Korea Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Name Plate, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2022

Shaft Support Modification and Related Works, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022

Replacement of Bottom Shaft Support for R-1201 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

Methanol Process Project, BioFriends Co., Ltd. 

Client: BioFriends Co., Ltd.
Service: EPC
Year: 2022

 Saemangeum New Project, Flowon Co., Ltd. 

Client: Flowon Co., Ltd.
Service: EPC
Year: 2022

Repair Work for Shaft Vibration of SR-202 Reactor, SFC Co., Ltd. 

Client: SFC Co., Ltd.
Service: EPC
Year: 2022

Cavic Marine & Offshore HEMT Reactor Pressure Test Work 

Client : Cavic Marine & Offshore
Service: EPC
Year: 2022

Supplementary Work for Vacuum System, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Bottom Pad Flange for R6-701 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022

Installation Work of Emission Reduction Facility for Coating Plant, Shinhan Heavy Industries Co., Ltd. 

Client: Shinhan Heavy Industries Co., Ltd.
Service: EPC
Year: 2022

Modification Work for WR-180, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2022

Manufacturing and Installation of Tanks for H-PROJECT, Enchem Co., Ltd.  

Client: Enchem Co., Ltd.
Service: EPC
Year: 2022

Replacement of Mechanical Seal for R-101 Reactor and Related Works, Heesung Catalysts Co., Ltd. 

Client: Heesung Catalysts Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Inner Coil for R-311AB, Samyang Precision Chemical Co., Ltd. 

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2022

Replacement Work of Electric Heater, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2022

PLC Control System Work for High-Viscosity Combination Mixer & Press Equipment, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021

Supply of PH Sensor, KPX Chemical Co., Ltd. 

Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2021

Mechanical Seal Repair, Replacement, and Related Works, CSIM Co., Ltd. 

Client: CSIM Co., Ltd. 
Service: EPC
Year: 2021

300 Process Modification Work, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021

Modification Work for Reactor Drive System of Insulation Line No. 2, LG Hausys Co., Ltd. 

Client: LG Hausys Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Mechanical Seal, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2021

Pre-Operation Inspection Work for Reactor, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2021

Supplementary Work for T-PROJECT, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021

Replacement Work of Bag Filter Pulse PCB, Yooyoung Materials Co., Ltd. 

Client: Yooyoung Materials Co., Ltd.
Service: EPC
Year: 2021

Replacement of Bottom Valve, Sangwon Chem Co., Ltd. 

Client: Sangwon Chem Co., Ltd.
Service: EPC
Year: 2021

Repair and Replacement Work of Motor & Reducer and Related Works, LG Hausys Co., Ltd. 

Client: LG Hausys Co., Ltd.
Service: EPC
Year: 2021

Modification Work for Fluidized Bed Dryer, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of TPC Carrier Drum, Lotte Fine Chemical Co., Ltd. 

Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021

Replacement Work of Lip Seal (SR-160), CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of New Lab Receiver Body, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Hot Oil Valve, Sewon Chemical Co., Ltd. 

Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2021

Repair Work for Internal Corrosion of R-1201 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

Manufacturing and Installation of STS Reactors and Cosmetic Purification System Equipment, FTC Korea Co., Ltd. 

Client: FTC Korea Co., Ltd.
Service: EPC
Year: 2021

Wood Screw Fabrication for SK Chemical Project, Youngil Engineering Co., Ltd.  

Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2021

Coal Screw Fabrication for SK Chemical Project, Youngil Engineering Co., Ltd.  

Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2021

B-Project (Chemical Business Division), Pharmicell Co., Ltd.  

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Portable Pump Frame and Related Works, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2021

A-Line Screw Feeder (2 Sets) Fabrication and Replacement, SUMaterials Co., Ltd. 

Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Lip Seals (SR-160, SR-220), CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021

Additional Electrical Panel Work and Related Works, Eco Chemical Co., Ltd. 

Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Condenser, Taesung Environmental Research Institute Co., Ltd. 

Client: Taesung Environmental Research Institute Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Lip Seal, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Silo Bridge Breaker, SK Chemical Co., Ltd. 

Client: SK Chemical Co., Ltd.
Service: EPC
Year: 2021

Installation of New Equipment and Related Works, RAIENT Co., Ltd. 

Client: RAIENT Co., Ltd.
Service: EPC
Year: 2021

Bag Filter (260 m³/min) Fabrication and Installation and Related Works, Cosmo Chemical Co., Ltd. 

Client: Cosmo Chemical Co., Ltd.
Service: EPC
Year: 2021

LION Project Execution, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2021

Drum Cleaning System Fabrication (Export to USA), Enchem Co., Ltd. 

Client: Enchem Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Hot Oil Tank and Related Works, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021

New Reactor Project (4.5㎥ Reactor Part), Korea Research Institute of Chemical Technology 

발주처 : 한국화학연구원
Service: EPC
Year: 2021

Heat Exchanger (Condenser) Fabrication and Delivery, Pharmicell Co., Ltd. Chemical Business Division 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2021

Replacement Work of Impeller Bolts for R-L304 and R-L305, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

Repair Work of Rotary Evaporative Vacuum Dryer, Samyang Precision Chemical Co., Ltd. 

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of New Spare Shaft for R-1501 CL2 Reactor, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

2 m³ Reactor and Utility Equipment – New Reactor Project, Wedel Materials Co., Ltd. 

Client: Wedel Materials Co., Ltd.
Service: EPC
Year: 2021

NMP Recovery System Utility Work, Shin Sung ENG Co., Ltd. 

Client: Shin Sung ENG Co., Ltd.
Service: EPC
Year: 2021

Modification Work of Utility Piping for Plant 1, WEMAS Co., Ltd. 

Client: WEMAS Co., Ltd.
Service: EPC
Year: 2021

Reactor Modification Work at Gwangyang Plant, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2021

Installation of 10 m³ and 0.6 m³ Polyol Tanks for Foaming Area and Related Works, Korea Carbon Co., Ltd. 

Client: Korea Carbon Co., Ltd.
Service: EPC
Year: 2021

Reactor & Vessel Head and Water Tank Fabrication for SUM C Project, Samsung Engineering Co., Ltd. 

Client: Samsung Engineering Co., Ltd.
Service: EPC
Year: 2021

Machinery & Equipment Supply for New Plant Construction (Goesan Plant), LS Chem Co., Ltd. 

Client: LS Chem Co., Ltd. 
Service: EPC
Year: 2021

Soil Contamination Assessment (NMP Storage Tank), Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Heat Exchanger and Drum for New Plant Construction at Onsan Plant, NH Chemical Co., Ltd. 

Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021

Manufacturing of Reactor and Vessel for New Plant Construction at Onsan Plant, NH Chemical Co., Ltd. 

Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021

S&T Heat Exchanger for R Project, Korea Petroleum Industrial Co., Ltd., Fields Engineering Co., Ltd. 

Fields Engineering Co., Ltd.
Service: EPC
Year: 2021

 R Project Pressure Vessel, Korea Petroleum Industrial Co., Ltd., Fields Engineering Co., Ltd. 

Fields Engineering Co., Ltd.
Service: EPC
Year: 2021

R-1501 CL2 Reactor Shaft Machining and Related Works, Nica Korea Co., Ltd. 

Fields Engineering Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Lip Seal (SR-160), CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020

Shaft Modification of Pre-Dispersion Mixer No. 2 & 3 (LGCNA), LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Lip Seal, CS Chemical Co., Ltd. 

Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020

Blower Motor Replacement and Installation Work, Giant Chemical Co., Ltd. 

Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020

Non-Destructive Testing (NDT) of Hazardous and Toxic Chemical Piping, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2020

Additional Construction Work for Vessel (Group B) under M1 Project, Ulsan Plant, Taekwang Industrial Co., Ltd. 

Client: Taekwang Industrial Co., Ltd.
Service: EPC
Year: 2020

Installation of Grinder Hood at Damyang Recycling Plant, Hansol EME Co., Ltd. 

Client: Hansol EME Co., Ltd.
Service: EPC
Year: 2020

Portable Melting System Fabrication and Delivery and Additional Works, IMC System Co., Ltd. 

Client: IMC System Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Heater, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Level Transmitter, Eco Intech Co., Ltd. 

Client: Eco Intech Co., Ltd.
Service: EPC
Year: 2020

Level Glass and Sight Glass Fabrication, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Heat Exchanger Bundle, Unisol Co., Ltd. 

Client: Unisol Co., Ltd.
Service: EPC
Year: 2020

Replacement Work of Reactor Bottom Ball Valve and Related Works, WEMAS Co., Ltd. 

Client: WEMAS Co., Ltd.
Service: EPC
Year: 2020

Level Glass Fabrication, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020

Jacket Plug Valve Replacement Work, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2020

Modification Work for PT Tank Support, Doosan Mecatec Co., Ltd. 

Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2020

Manufacturing of Paddle Impeller, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2020

High-Speed Shaft Replacement Work for Pre-Dispersion Mixer (LG Electronics Production Technology Institute), LG Electronics Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2020

Cyclone Fabrication and Delivery, Neo Co., Ltd. 

Client: Neo Co., Ltd.
Service: EPC
Year: 2020

Mixing Tank Fabrication and Delivery and Related Works, Shinjin Construction Co., Ltd. 

Client: Shinjin Construction Co., Ltd.
Service: EPC
Year: 2020

Central Chute Fabrication and Delivery, Myungseong Tech Co., Ltd. 

발주처 : 명성테크
Service: EPC
Year: 2020

Wax Separation Tank Fabrication, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2020

Instant Hot Water Heat Exchanger Repair Work at Dangjin Steel Plant, Hyundai Steel Co., Ltd. 

Client: Hyundai Steel Co., Ltd.
Service: EPC
Year: 2020

Reclaimer No. 114 Installation for Raw Material Plant (Boom), POSCO Plantec Co., Ltd. 

Client: POSCO Plantec Co., Ltd.
Service: EPC
Year: 2020

Heat Exchanger Fabrication and Delivery for Oligosaccharide Hydrolysis Process, Jaewon Industrial Co., Ltd.   

Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2020

Wood Silo Screw Fabrication, Youngil Engineering Co., Ltd. 

Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2020

Dissolve Tank Fabrication and Delivery, AcuS Co., Ltd.  

Client: AcuS Co., Ltd.
Service: EPC
Year: 2020

Steam Header Fabrication, WCP Co., Ltd. (W-SCOPE KOREA) 

Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2020

Manufacturing and Installation of LNG Stack, Hansol Papertech Co., Ltd. 

Client: Hansol Papertech Co., Ltd.
Service: EPC
Year: 2020

Quality Improvement of IE-TPU Belt and Silo Relocation Project, DongSung Corporation Co., Ltd. 

Client: DongSung Corporation Co., Ltd.
Service: EPC
Year: 2020

Manufacturing and Installation of 10 m³ Reactor, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2020

Reactor Demolition and New Reactor Fabrication & Installation and Related Works, Sewon Chemical Co., Ltd. 

Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2020

Portable Thinner Packing System Fabrication, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2020

Planned Maintenance Work for Heat Exchangers in Preparation for 2020 Energy Inspection, Hyundai Steel Co., Ltd. 

Client: Hyundai Steel Co., Ltd.
Service: EPC
Year: 2020

High-Viscosity Combination Mixer & Press Equipment Installation Work, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2020

MC & WAX Regeneration System (WCP-5,6) Evaporator and Heat Exchanger Fabrication, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020

Hungary Project, Dongwha Electrolyte Co., Ltd. 

Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020

MS Heat Exchanger and Turbine Aftercooler Fabrication and Delivery, Hyundai Rotem Co., Ltd. 

Client: Hyundai Rotem Co., Ltd.
Service: EPC
Year: 2020

200L PE Tank Weighing System Fabrication, Samyoung Sunhwa Co., Ltd. 

Client: Samyoung Sunhwa Co., Ltd.
Service: EPC
Year: 2020

Ion Exchange Fiber Tank Fabrication and Installation Work, Samyang Precision Chemical Co., Ltd. 

Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2020

Column (0.56 m³) Fabrication and Installation and Related Works, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2020

FGD Wastewater Treatment Plant Project, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2020

MC Storage Tanks (50 m³, 3 Units) Fabrication and Installation, WPC Co., Ltd. 

Client: WPC Co., Ltd.
Service: EPC
Year: 2020

Fluidized Bed Dryer Installation Work, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2020

Fin-Tube Type Heat Exchangers (4 Units) Fabrication for Yeosu CNT Project, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2020

Mobile Stair Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2020

Portable Melting System Fabrication and Delivery, Samyoung Sunhwa Co., Ltd. 

발주처 : 삼영순화
Service: EPC
Year: 2020

Internal Repair Work for Reactor [RH-02], DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2019

Desuperheater Water Storage Tank Additional Fabrication, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

New AC Plant (Phase 2) and Additional Works, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019

Jacket Ball Valve Replacement Work, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019

Raw Material Double Piping System Repair Work, MNB Greener’s Co., Ltd.  

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019

Co-Precipitation Tank Foreign Material Catcher Installation, POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019

Dock System Fabrication and Installation, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

COP-P Reactor (3 m³) Agitator Part Replacement Work, POSCO Chemical Co., Ltd. 

Client : POSCO CHEMICAL
Service: EPC
Year: 2019

Installation of Component Storage Tanks and Related Additional Works, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

POSCO CHEMICAL COP-1 Agitating Tank Overhaul Work (2차) 

Client : POSCO CHEMICAL
Service: EPC
Year: 2019

LG HAUSYS PFA Hopper Modification 

Client : LG HAUSYS
Service: EPC
Year: 2019

Chamber Lift Repair Work for Existing Facility, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2019

Replacement Work of Motor & Reducer, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019

Reactor Manhole Modification Work (5 Units), Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019

Bracket Fixing of Reactor and Non-Destructive Testing (NDT) for Hazardous Chemical Piping, Daesong Precision Chemical Co., Ltd. 

Client: Daesong Precision Chemical Co., Ltd.
Service: EPC
Year: 2019

Motor Specification Change Work for Auxiliary Mixer Units No. 2 & 3 (CAN Electrode), LG Electronics Co., Ltd. 

Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2019

COP-1 Agitating Tank Overhaul Work, POSCO Chemical Co., Ltd. 

Client : POSCO CHEMICAL
Service: EPC
Year: 2019

Leaching Facility Additional Works, SeAH M&S Co., Ltd. 

Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2019

Replacement Work of Internal Coil for B-4 Tank, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

Pre-Mixer Fabrication and Installation, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2019

E-1307 Equipment Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019

Replacement Work of Heater, Daekwang Industrial Co., Ltd. 

Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2019

Piping Modification Work, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

Adhesive Equipment Modification for Existing Production Facility, Hwasung Industries Co., Ltd. 

Client: Hwasung Industries Co., Ltd.
Service: EPC
Year: 2019

Shaft Lower Support Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019

Hot Water Vessel Condensate Downstream Line Insulation Work, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019

Fireproof Coating Work for Production Building, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019

Installation of New Drum Oven, Korea Shell Oil Co., Ltd. 

Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019

Skid Fabrication, Doosan Mecatec Co., Ltd.  

Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2019

COPO1 Initial Tank Installation at Co-Precipitation Building (2F, Gumi Cathode Material Plant), POSCO Chemical Co., Ltd. 

Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019

Skid Fabrication for ExxonMobil Project, Doosan Mecatec Co., Ltd. 

Client: Doosan Mecatec Co., Ltd. 
Service: EPC
Year: 2019

M-Project Execution, Myungil Formtech Co., Ltd. 

Client: Myungil Formtech Co., Ltd.
Service: EPC
Year: 2019

Evaporation Precipitation Reactor Fabrication, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019

Hydrolysis Reactor Fabrication, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019

50 m³ Caustic Soda Storage Tank Fabrication and Installation and Related Works, Dankook Industrial Co., Ltd. 

Client: Dankook Industrial Co., Ltd.
Service: EPC
Year: 2019

Desuperheater Water Storage Tank Fabrication, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

M1 Project Vessel (Group B) Fabrication, Taekwang Industrial Co., Ltd. 

발주처 : 태광산업㈜
Service: EPC
Year: 2019

Transfer Car Fabrication and Delivery for Shinseocheon Thermal Power Plant, Chosun Refractories Engineering Co., Ltd. 

Client: Chosun Refractories Engineering Co., Ltd.
Service: EPC
Year: 2019

Reactor (12 m³) Fabrication and Installation and Related Works, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2019

NGHI SON 2 BOT Thermal Power Plant Project Execution, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

Vacuum Evaporation Reactor Fabrication, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019

Condenser (45 m², 2 Units) Fabrication and Installation, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2019

Condenser Channel Part Replacement Work, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2019

Installation Work of Foundation Plate for Silo & Storage Tank, WCP Co., Ltd. 

Client : WCP Co., Ltd.
Service: EPC
Year: 2019

Trailer & Tripper Frame Assembly Fabrication, Shinhung Industry Co., Ltd. 

Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019

New Indoor Hazardous Materials Storage Facility Construction and Storage Tank Fabrication & Installation, Ceres F&D Co., Ltd. 

Client: Ceres F&D Co., Ltd.
Service: EPC
Year: 2019

High-Temperature Reactor (5 m³) Project, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2019

Steam Header Fabrication for CP03 & CP04 Lines, WCP Co., Ltd. 

Client : WCP Co., Ltd.
Service: EPC
Year: 2019

HWASEUNG CHEMICAL VIETNAM REACTOR 3M3 PROJECT (VIETNAM) 

Client: Hwasung Chemical Vietnam Co., Ltd.
Service: EPC
Year: 2019

Reactor & Tank (316) Fabrication and Installation, CSIM Co., Ltd. 

Client: CSIM Co., Ltd.
Service: EPC
Year: 2019

CWA Coater Supply Tank Fabrication, LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2019

1.2 m³ Twin Mixer Teflon Coating Work, Daehyup Tech Co., Ltd. 

Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2019

C-Feeding System Modification Work, LS-Nikko Copper Inc. 

Client: LS-Nikko Copper Inc.
Service: EPC
Year: 2019

Hazardous Material Transfer Tank Fabrication and Delivery, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2019

COP2 Reactor Motor & Reducer Replacement Work, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

Hot Oil Line Repair Work (RB-L302), Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Safety Valve Replacement Work, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2018

FC Reactor Body Replacement and Related Works, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Sand Filter Media Replacement Work at Air Products Korea 2nd Plant 

Client: Air Products Korea 2nd Plant
Service: EPC
Year: 2018

M-107 Mixer (3 m³) Reducer Replacement Work, Unis Co., Ltd. 

Client : Unis Co., Ltd.
Service: EPC
Year: 2018

Reactor Motor & Reducer Replacement Work and Related Works, MNB Greener’s Co., Ltd. 

Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2018

Cooling Air Line Temperature Sensor Installation Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Load Cell Installation Work for Vent Buffer Tank 1 m³ (VBT-200), Woojin Polymer Co., Ltd. 

Client: Woojin Polymer Co., Ltd.
Service: EPC
Year: 2018

Reactor (5 m³) Shaft Sprocket Fabrication and Replacement Work, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2018

Brass Nozzle Fabrication, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

Bag Filter Module Fabrication and Related Works, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Additional Powder Can Fabrication, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Foam Spray System Fabrication, Misan R&C Co., Ltd. 

Client: Misan R&C Co., Ltd.
Service: EPC
Year: 2018

Cooling Water Pump Replacement Work, ABC Nanotech Co., Ltd. 

Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2018

Cooling Air Supply Y-Piping Modification Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Cooling Air Line Modification Insulation Work, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Chiller Water Pump On/Off Panel Fabrication, LG Hausys Co., Ltd. 

Client : LG HAUSYS
Service: EPC
Year: 2018

Jacket Mixer Body Fabrication and Related Works, Jungwon Engineering Co., Ltd. 

Client: Jungwon Engineering Co., Ltd.
Service: EPC
Year: 2018

Evaporator Fabrication and Related Works, One Engineering Co., Ltd. 

Client: One Engineering Co., Ltd.
Service: EPC
Year: 2018

Receiver Tank Fabrication for Experimental Facility and Related Works, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

Evaporator Modification Work, DS Liquid Co., Ltd. 

Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2018

Heat Exchanger Fabrication and Installation and Related Works, LG Chem Co., Ltd. 

Client: LG Chem Co., Ltd.
Service: EPC
Year: 2018

MS-Bed Regeneration Heater Improvement and Replacement for Oxygen Plant 14, POSCO Co., Ltd. 

Client : POSCO Co., Ltd.
Service: EPC
Year: 2018

CNA Electrode Line No. 3 Auxiliary Mixer Unit, LG Electronics Production Technology Institute Co., Ltd. 

Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2018

Reactor (7 m³) Fabrication and Installation and Related Works, Sewon Chemical Co., Ltd. 

Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2018

Reactor (4,000 L) Fabrication and Related Works [JMC], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Reactor (2,500 L) Fabrication and Related Works [EMEX Solution], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Reactor Fabrication and Related Works [Miwon Commercial], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Pilot Reactor Modification Work, AK Chemtech Co., Ltd. 

Client: AK Chemtech Co., Ltd.
Service: EPC
Year: 2018

5 m³ Mixer Plant Fabrication, Hera Industry Co., Ltd. 

Client: Hera Industry Co., Ltd.
Service: EPC
Year: 2018

Reactor Bare Vessel Fabrication and Related Works [Sunjin Beauty Science], GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

MC Storage Tanks (50 m³) Fabrication and Installation, WCP Co., Ltd. 

Client : WCP Co., Ltd.
Service: EPC
Year: 2018

High-Temperature Reactor (5 m³) Fabrication and Related Works, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2018

Vessel and Filter Components for Plant Expansion Project (Gwangyang Site), POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

Leaching FRP Facility Installation Work, SeAH M&S Co., Ltd. 

Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2018

2,000 L G/L Reactor Fabrication for Sambo Precision Chemical, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

1,000 L Reactor Fabrication and Related Works for Woojin Polymer, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

10,000 L Reactor Fabrication and Related Works for Cheonbo & Miwon Commercial, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Reboiler Fabrication and Related Works, Jaewon Industrial Co., Ltd. 

Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2018

WJF Project – 3rd Class Production Facility and Two Storage Tanks Fabrication and Installation, Wisol Co., Ltd. 

Client: Wisol Co., Ltd.
Service: EPC
Year: 2018

Cylindrical Reformer Fabrication (100 Units), S-Fuelcell Co., Ltd. 

Client: S-Fuelcell Co., Ltd.
Service: EPC
Year: 2018

Manufacturing and Installation of 15.5 m³ Storage Tank, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2018

Replacement Work of Hoist, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

3,000 L Reactor Fabrication for Garam Nano, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

CE-8000 and 20,000 L Reactor Fabrication (Cost-Based Work) for Dongyang, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

10 m³ Bromine Receiver Bare Vessel Fabrication, Dongyang Industry Co., Ltd. 

Client: Dongyang Industry Co., Ltd.
Service: EPC
Year: 2018

ROI Reactor (10 m³) Replacement and Related Works, Nica Korea Co., Ltd. 

Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018

COP-P PP Building Reactor (10 m³) Expansion Project, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

COP-1 MP1 Modification Work, POSCO ESM Co., Ltd. 

Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018

25 m³ G/L Reactor Bare Vessel Fabrication and Related Works, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Heat Recovery System for Biopharmaceutical Manufacturing Process, Pharmicell Co., Ltd. 

Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2018

Diaphragm Pump Replacement and Related Works, Segye Chemical Co., Ltd. 

Client: Segye Chemical Co., Ltd.
Service: EPC
Year: 2018

Heat Exchanger Fabrication, Scandinavian Biogas Korea Co., Ltd. 

Client: Scandinavian Biogas Korea Co., Ltd.
Service: EPC
Year: 2018

Modification Work of Heat Exchanger, Jaewon Industrial Co., Ltd. 

Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2018

Reactor (6 m³) Fabrication and Related Works, KOEM Co., Ltd. 

Client: KOEM Co., Ltd.
Service: EPC
Year: 2018

Reactor (10 m³) Fabrication and Related Works, GLK Powdler Co., Ltd. 

Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018

Cyclopentane Storage Tank Plant (30 m³) Fabrication and Related Works, Gana IS Co., Ltd. 

Client: Gana IS Co., Ltd.
Service: EPC
Year: 2018

Reactor Modification Work, Mecapoly Co., Ltd. 

Client: Mecapoly Co., Ltd.
Service: EPC
Year: 2018

Foam Spray System Fabrication, Hanjoong Yuhwa Co., Ltd. 

Client: Hanjoong Yuhwa Co., Ltd.
Service: EPC
Year: 2018

Reactor (0.8 m³) Replacement Work, DFC Co., Ltd. 

Client: DFC Co., Ltd.
Service: EPC
Year: 2018