
CHEMICALㆍGASㆍPOWDER
화학ㆍ가스ㆍ분체 관련 실적입니다
ChemicalㆍGas · Powder
Through our experience in chemical plant construction focused on reaction and mixing processes,
we have secured process stability and operational reliability.
• Chemical Process Plant Engineering & Construction Projects
• Chemical Plant Execution including Reactors and Agitators
• Fine Chemical Process EPC Projects
• Chemical Plant Fabrication & Construction Experience

REACTOR
It is used for catalytic chemical reactions in petrochemical and synthetic chemical industries, including polymerization and synthesis of chemical substances.
It enables flexible design according to material properties and operating conditions such as environment, temperature, and pressure, and provides excellent mixing performance.
Features:
Accurate analysis of heat transfer media ensures excellent heating and cooling performance.
Special welding techniques provide superior joint strength and sealing integrity.
Various impeller configurations enable optimal mixing performance,
and automated temperature control and system automation can be implemented.
Types:
– Heating Method (Hot Water, Steam, Thermal Oil)
– Cooling Method (Cooling Water, Chilled Water, Refrigerant)

HEAT EXCHANGER
A heat exchanger is a device that transfers heat from a high-temperature fluid to a low-temperature fluid through a heat transfer surface. It utilizes heat conduction driven by the temperature difference between the tube side and the shell side.
Depending on the application, it can be used as a heater, cooler, evaporator, or condenser.
In general, shell & tube heat exchangers are widely used, and various types such as BEM and BEU
are classified according to the configuration of the shell and tube bundle.
Types:
– Shell & Tube Type Heat Exchanger
– Spiral Type Heat Exchanger

MIXER
A reactor consists of a tank and an agitator drive system, and is designed for mixing internal materials.
It enables controlled mixing of substances by adjusting appropriate temperature, pressure, and agitator speed, and also serves to prevent solidification by continuously stirring the contents.
Types:
– Nauta Mixer (Nauta Type Mixer)
– High & Low Speed Mixer
– Ribbon Mixer
– Screw Mixer /
Twin Screw Mixer

STORAGE TANK
A storage tank is a facility used to store or transport various types of fluids, including gases and liquids.
It offers strong resistance to temperature changes and impact loads, and ensures a long service life with no leakage risk, particularly through CO₂ and TIG welding.
Depending on the operating environment, it can be manufactured from various materials such as steel, stainless steel, FRP, and plastic.
Types:
– Cone Roof Tank (CRT)
– Floating Roof Tank (FRT)
– Dome Roof Tank (DRT)
– Spherical or Ball Tank

DISSOLVER
A dissolver is a basic mixing equipment used to blend viscous liquid raw materials.
It is primarily designed for agitation and mixing, and consists of a drive unit, shaft, and blade system.
The size and drive power of a dissolver are determined by the vessel size, viscosity, and characteristics of the fluid.
In some cases, dissolvers are supplied with dedicated vessels as an integrated system.

DISTILLATION COLUMN
A distillation unit is a facility that separates required components by utilizing differences in boiling points or volatility of fluids.
Since it operates under high temperature and pressure conditions, it is designed to withstand severe thermal and mechanical stress.
Depending on the application and separation method, it can be classified into vacuum distillation,
azeotropic distillation, and extractive distillation.
Features:
Capable of separating even substances with minimal boiling point differences and effectively removing various types of impurities.
Types:
– Vacuum Distillation Column
– Azeotropic Distillation Column
– Extractive Distillation Column

DEAERATOR
A deaerator is an essential equipment used in power generation facilities, boilers, and incinerators.
It removes dissolved gases such as oxygen and carbon dioxide from feedwater, effectively preventing corrosion and
performance degradation in pipelines and plant equipment, thereby extending service life.
It is used to remove dissolved oxygen from feedwater supplied to heating systems such as boilers, thereby preventing corrosion of equipment.
It is also applied in food, cosmetic, and pharmaceutical processes to remove dissolved gases, improving product stability during storage and preventing oxidation effects.
Types (by configuration):
– Vertical Deaerator
– Horizontal Deaerato
Types (by function):
– Tray Type Deaerator
– Scrubber Type Deaerator

FITRATION SYSTEM
A separator is a device that separates mixtures of fluids and solids based on differences in particle size.
It is used for concentrating
or purifying materials based on physical or chemical properties.

PRESSURE VESSEL
A pressure vessel in the petrochemical industry is designed to store or contain liquids and gases under pressure, or to serve as a reactor for processing operations.
Depending on its application, heat exchangers, reactors, and storage tanks can also be classified as pressure vessels.
Features:
Uniform stress distribution due to internal pressure, safe and robust structure with no stress concentration points.
Enables precise control of temperature and pressure, and easy operation through process automation.
Capable of storing dry and water-soluble gases, and allows rapid opening and closing of high-pressure
chambers.

PIPING
Piping work refers to the installation and construction of piping systems required for transporting liquids and gases within industrial facilities.
It is designed and fabricated to ensure efficient fluid transportation between different locations.
Types:
– Seal Water Piping
– Cooling Water Piping (CWS & CWR Piping)
– Chiller Piping
– Steam Piping
– Air Piping
– Condensate Piping
– Wastewater Piping

STRUCTURE
The term “STRUCTURE” refers to large steel-based structures as a general category. It is used in various applications, including supporting industrial equipment, structural building frameworks, and offshore structures.

AUTOMATIC CONTROL SYSTEM
자동화 시스템
An automation system that monitors and controls production processes to improve efficiency and safety in manufacturing operations.
Slurry Batch Post-Treatment System for Aekyung Chemical Co., Ltd. Daejeon Research Institute
Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025
Leak Test of Two Existing Heat Exchangers for Zeus Petrochemical Co., Ltd.
Client: Zeus Petrochemical Co., Ltd.
Service: EPC
Year: 2025
Inline Homo Mixer System for HC Plant, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025
Repair of Pilot 70L Band Heater for Aekyung Chemical Co., Ltd. Daejeon Research Institute
Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025
Repair Work of SC-1501 Scrubber for Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025
Repair Work of SC-1501 Scrubber for Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2025
Leak Repair Work of Existing R-202 Reactor for Hankem Co., Ltd.
Client: Hankem Co., Ltd.
Service: EPC
Service Period: 2025-12-24
Repair of Si-C DP 50MT Air Compressor for POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025
6PP Granulation Mixer Replacement Project for RIST
Client: Pohang Research Institute of Industrial Science & Technology (RIST)
Service: EPC
Year: 2025
Manufacturing and Delivery of Knock-Out Drum for CNT Project, Enchem Georgia Plant Co., Ltd.
Client: Enchem Co., Ltd.
Service: EPC
Year: 2025
Heat Exchanger Manufacturing Quotation for Biofuels Project, KG Chemical Co., Ltd.
Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025
Manufacturing of Reactor & Vessel for Biofuels Project, KG Chemical Co., Ltd.
Client: KG Chemical Co., Ltd.
Service: EPC
Year: 2025
Installation of Lube Recutting Plant at Onsan Plant, Zeus Petrochemical Co., Ltd.
Client: Zeus Petrochemical Co., Ltd.
Service: EPC
Year: 2025
Additional Installation of Plate Type Heat Exchanger for Si-C Project, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025
Leak Repair of Mixing Tank Nozzle, Daekwang Industrial Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2025
Installation Work of Storage Tank for Building C, 2nd Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2025
Manufacturing of Vacuum Receiver Tank and Related Equipment, Songwoo EM Co., Ltd.
Client: Songwoo EM Co., Ltd.
Service: EPC
Year: 2025
New Reactor Manufacturing, Reactor Replacement, and Air Dryer Installation Project, Hwasung Chemical Co., Ltd.
Client: Hwasung Chemical Co., Ltd.
Service: EPC
Year: 2025
Additional Side Manhole Installation for Two Wastewater Tanks, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025
500L Vacuum Dryer Manufacturing and Existing Equipment Improvement Project, Dongin Chemical Co., Ltd. Pyeongtaek Plant
Client: Dongin Chemical Co., Ltd.
Service: EPC
Year: 2025
Repair Work of Four Condensers at Buyeo Plant, Dongin Chemical Co., Ltd.
Client: Dongin Chemical Co., Ltd.
Service: EPC
Year: 2025
Improvement of Existing 500L Reactor for Heesung Catalysts Co., Ltd.
Client: Heesung Catalysts Co., Ltd.
Service: EPC
Year: 2025
Belt Conveyor Installation (Hopper & Cyclone Section), KH EcoTech Co., Ltd.
Client: KH EcoTech Co., Ltd.
Service: EPC
Year: 2025
Manufacturing and Delivery of T-8201 Column for Aekyung Chemical Co., Ltd.
Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2025
Steam Trap Replacement Work, Rupax Co., Ltd.
Client: Rupax Co., Ltd.
Service: EPC
Year: 2025
Fabrication of Two 41CMM AC Towers, Hanyang Industry Co., Ltd.
Client: Hanyang Industry Co., Ltd.
Service: EPC
Year: 2025
Frozen City Water Piping Response and Air Compressor Repair at Si-C DP City, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2025
Vent Ozone Condenser Fabrication, Bando ENT Co., Ltd.
Client: Bando ENT Co., Ltd.
Service: EPC
Year: 2025
Supply of Materials for Upper Shaft Replacement of R-200 Reactor (1.5㎥), Samyang Precision Chemical Co., Ltd.
Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2025
Suction Tank Fabrication, Sangwon Chem Co., Ltd.
Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024
Repair Work of Si-C Chiller Water Pump, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year of Service: 2024
Manufacturing and Delivery of Canvas for Kolon Life Science Co., Ltd.
Client: Kolon Life Science Co., Ltd.
Service: EPC
Year of Service: 2024
Supply and Delivery of New Band Heaters for Aekyung Chemical Co., Ltd.
Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Replacement of O-Ring for Glass Lined Condenser Tube at Gongju Plant, Dongin Chemical Co., Ltd.
Client: Dongin Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Improvement Work for SR-160 and WR-140, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Installation of Decanter Flowmeter, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024
Installation of Portable Tank Band Heater, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024
Correction Work for Shaft Vibration of Reactors No. 2 & 3 at Insulation Plant, LX Hausys Co., Ltd.
Client: LX Hausys Co., Ltd.
Service: EPC
Year of Service: 2024
Disassembly and Installation of WT-120 Motor & Reducer and Related Works, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Supply of LNG High-Pressure Gas Production Facility for BioFriends Co., Ltd.
Client: BioFriends Co., Ltd.
Service: EPC
Year of Service: 2024
Replacement Work of Wastewater Tank, Sangwon Chem Co., Ltd.
Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024
Manufacturing and Installation of Load Cell Shim Plate and Related Works, POSCO Future M (Hanatech) Co., Ltd.
Client: POSCO Future M (Hanatech) Co., Ltd.
Service: EPC
Year of Service: 2024
Manufacturing of Emulsifier System, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024
Additional Construction Work for LiM X1 Project (MVR Part), 4th Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024
Replacement Work of Condensate Tank V-015 for MVR System, 4th Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024
Replacement Work of Shaft for 3㎥ Mixer at Boryeong Plant, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year of Service: 2024
Non-Destructive Testing (NDT) of XYLENE Line, Sangwon Chem Co., Ltd.
Client: Sangwon Chem Co., Ltd.
Service: EPC
Year of Service: 2024
Manufacturing and Installation of Screw Conveyor for 2nd Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year of Service: 2024
Wastewater Storage Tank Repair, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year of Service: 2024
Hazardous Materials Transport Container Fabrication, G-CHEMS Co., Ltd.
Client: G-CHEMS Co., Ltd.
Service: EPC
Year of Service: 2024
Repair of Vacuum Pump, Eco Chemical Co., Ltd.
Client: Eco Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Engineering Service for Expansion Design of BD Distillation Facility at Ulsan Plant, Aekyung Chemical Co., Ltd.
Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Manufacturing of Canvas, ML Tech Co., Ltd.
Client: ML Tech Co., Ltd.
Service: EPC
Year of Service: 2024
Chamber Insulation Work for Surface Treatment Equipment (Advanced Materials), Korea Carbon Co., Ltd.
Client: Korea Carbon Co., Ltd.
Service: EPC
Year of Service: 2024
Repair of N3P-R301 Mechanical Seal, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024
Dehumidification System Fabrication, Hwasung Chemical Co., Ltd.
Client: Hwasung Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Replacement of N3P-R301 Mechanical Seal, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024
FC N0 Overhaul Work, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024
30㎥ Methanol Storage Tank Fabrication and Related Works, WooYang H&C Co., Ltd.
Client: WooYang H&C Co., Ltd.
Service: EPC
Year of Service: 2024
Repair Work of Outdoor Tank at Coating Part, Korea Carbon Co., Ltd.
Client: Korea Carbon Co., Ltd.
Service: EPC
Year of Service: 2024
Repair Work for Internal Corrosion of R6-701 Reactor, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024
Transfer of 20㎥ Reactor and Electrical Works, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year of Service: 2024
Storage Tank Fabrication for ED#1 Project, Eco & Dream Co., Ltd.
Client: Eco & Dream Co., Ltd.
Service: EPC
Year of Service: 2024
SR-160 Lip Seal Replacement and WR-150 Steam Line Maintenance, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year of Service: 2024
Manufacturing and Delivery of Manhole Spring Jack, Daelim Engineering Co., Ltd.
Client: Daelim Engineering Co., Ltd.
Service: EPC
Year: 2023
Manufacturing and Delivery of Manhole Spring Jack, Daelim Engineering Co., Ltd.
Client: Daelim Engineering Co., Ltd.
Service: EPC
Year: 2023
Manufacturing of Anchor Impeller, LX Hausys Co., Ltd.
Client: LX Hausys Co., Ltd.
Service: EPC
Year: 2023
Ultium CAM p_CAM_Tank (Feed & Storage Vessels, Reactor)
Client: Ultium CAM
Service: EPC
Year: 2023
Supply and Installation of Concentration System Plant for 4th Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023
Vacuum Distillation Tower Repair Work at Ulsan Plant, Michang Oil Industrial Co., Ltd.
Client: Michang Oil Industrial Co., Ltd.
Service: EPC
Year: 2023
Vibrating Screen Fabrication and Installation for 2nd Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023
Supply and Installation of Ton Bag Breaker System, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2023
Paint Booth & Auto Roll Filter Fabrication and Installation, Shinmyeong Entec Co., Ltd.
Client: Shinmyeong Entec Co., Ltd.
Service: EPC
Year: 2023
MVR Part Additional Installation Work for 2nd Plant, Sebitchem Co., Ltd.
Client: Sebitchem Co., Ltd.
Service: EPC
Year: 2023
Replacement Work of SR-160 Lip Seal, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2023
Installation Work of GCOP-1 Concentration Filter System at Gwangyang Plant, POSCO Future M Co., Ltd.
Client: POSCO Future M Co., Ltd.
Service: EPC
Year: 2023
Manufacturing and Installation of 5㎥ Reactor and TCU System, Myungjin Global Co., Ltd.
Client: Myungjin Global Co., Ltd.
Service: EPC
Year: 2023
EPC Contract for General Handling Permit Related to Chemical Laboratory, Aekyung Chemical Co., Ltd.
Client: Aekyung Chemical Co., Ltd.
Service: EPC
Year: 2023
Knock-Out Drum Fabrication and Installation, EGIS Co., Ltd.
Client: EGIS Co., Ltd.
Service: EPC
Year: 2023
Drive System Improvement Work for Reactors No. 3 & 4 (Insulation Plant), Manufacturing & Delivery, LX Hausys Co., Ltd.
Client: LX Hausys Co., Ltd.
Service: EPC
Year: 2023
20 Nm³/hr DME Hydrogen Reforming System, Labsys Korea Co., Ltd.
Client: Labsys Korea Co., Ltd.
Service: EPC
Year: 2023
Air Tank and Air Header Installation for Existing Plant, RAIENT Co., Ltd.
Client: RAIENT Co., Ltd.
Service: EPC
Year: 2023
NAPHTHA Project Skid Fabrication, BioFriends Co., Ltd.
Client: BioFriends Co., Ltd.
Service: EPC
Year: 2023
Receiver System Fabrication, Mokwoo Research Institute Co., Ltd.
Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023
Nutsche Filter Fabrication, Mokwoo Research Institute Co., Ltd.
Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023
NaOH Feeding System Fabrication, Mokwoo Research Institute Co., Ltd.
Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023
TCU Installation for Cooling Water Tank, Polysis Co., Ltd.
Client: Polysis Co., Ltd.
Service: EPC
Year: 2023
MC Wax Regeneration System Fabrication for WHP HP01~04 Line, One Engineering Co., Ltd.
Client: One Engineering Co., Ltd.
Service: EPC
Year: 2023
Air System Fabrication and Installation, Mokwoo Research Institute Co., Ltd.
Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023
Replacement of Glass Lined Reactor Impellers (2 Sets), LS Chem Co., Ltd.
Client: LS Chem Co., Ltd.
Service: EPC
Year: 2023
Existing Ribbon Mixer Modification Work, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2023
Steam Header Fabrication, WCP Co., Ltd. (W-SCOPE KOREA)
Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2023
Vacuum Dryer Fabrication and Installation, Mokwoo Research Institute Co., Ltd.
Client: Mokwoo Research Institute Co., Ltd.
Service: EPC
Year: 2023
Blower Motor Replacement Work, Sein ENG Co., Ltd.
Client: Sein ENG Co., Ltd.
Service: EPC
Year: 2023
Pre-Engineering for Base Facilities of Continuous Artificial Graphite Demo Plant, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023
Manufacturing and Installation of SMC Storage Tank, Korea Carbon Co., Ltd.
Client: Korea Carbon Co., Ltd.
Service: EPC
Year: 2023
Construction of New Liquid Metal Line for Existing COP-3 at Gwangyang Plant, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023
Manufacturing and Installation of Three MC Storage Tanks, WCP Co., Ltd. (W-SCOPE KOREA)
Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2023
Replacement of Vacuum Dryer Temperature Sensor, Eco Chemical Co., Ltd.
Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2023
Procurement of Reactors and Receivers for Phase 2 Expansion Investment of Precursor Plant in Gwangyang, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2023
Manufacturing of 5L Pilot Reactor System, Pierita Co., Ltd.
Client: Pierita Co., Ltd.
Service: EPC
Year: 2022
EP Work for Structural Components of Si-C Anode Material Demo Plant R&D Project, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022
KEZE NOVEL MATERIALS Pilot Reactor 50L Package
Client: KEZE Novel Materials
Service: EPC
Year: 2022
Manufacturing of Silica Production Plant (150 Ton Capacity), ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022
Procurement of Tanks for Phase 2 Expansion Investment of Precursor Plant (Gwangyang), POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2022
Condenser (20㎡) Fabrication, Hwasung Gas Tech Co., Ltd.
Client: Hwasung Gas Tech Co., Ltd.
Service: EPC
Year: 2022
Replacement Work of Existing Bag Filter Bags, Sein ENG Co., Ltd.
Client: Sein ENG Co., Ltd.
Service: EPC
Year: 2022
Modification of Reactor Manhole, Hankem Co., Ltd.
Client: Hankem Co., Ltd.
Service: EPC
Year: 2022
Improvement Work for RS-304, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022
Manufacturing of New Filter-Type Concentrator, ENDD Co., Ltd.
Client: ENDD Co., Ltd.
Service: EPC
Year: 2022
Pump and Instrumentation for Methanol Process, Labsys Korea Co., Ltd.
Client: Labsys Korea Co., Ltd.
Service: EPC
Year: 2022
Replacement Work of Name Plate, Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2022
Shaft Support Modification and Related Works, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2022
Replacement of Bottom Shaft Support for R-1201 Reactor, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022
Methanol Process Project, BioFriends Co., Ltd.
Client: BioFriends Co., Ltd.
Service: EPC
Year: 2022
Saemangeum New Project, Flowon Co., Ltd.
Client: Flowon Co., Ltd.
Service: EPC
Year: 2022
Repair Work for Shaft Vibration of SR-202 Reactor, SFC Co., Ltd.
Client: SFC Co., Ltd.
Service: EPC
Year: 2022
Cavic Marine & Offshore HEMT Reactor Pressure Test Work
Client : Cavic Marine & Offshore
Service: EPC
Year: 2022
Supplementary Work for Vacuum System, Eco Chemical Co., Ltd.
Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2022
Replacement Work of Bottom Pad Flange for R6-701 Reactor, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2022
Installation Work of Emission Reduction Facility for Coating Plant, Shinhan Heavy Industries Co., Ltd.
Client: Shinhan Heavy Industries Co., Ltd.
Service: EPC
Year: 2022
Modification Work for WR-180, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2022
Manufacturing and Installation of Tanks for H-PROJECT, Enchem Co., Ltd.
Client: Enchem Co., Ltd.
Service: EPC
Year: 2022
Replacement of Mechanical Seal for R-101 Reactor and Related Works, Heesung Catalysts Co., Ltd.
Client: Heesung Catalysts Co., Ltd.
Service: EPC
Year: 2022
Replacement Work of Inner Coil for R-311AB, Samyang Precision Chemical Co., Ltd.
Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2022
Replacement Work of Electric Heater, Daekwang Industrial Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2022
PLC Control System Work for High-Viscosity Combination Mixer & Press Equipment, Daehyup Tech Co., Ltd.
Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021
Supply of PH Sensor, KPX Chemical Co., Ltd.
Client: KPX Chemical Co., Ltd.
Service: EPC
Year: 2021
Mechanical Seal Repair, Replacement, and Related Works, CSIM Co., Ltd.
Client: CSIM Co., Ltd.
Service: EPC
Year: 2021
300 Process Modification Work, Lotte Fine Chemical Co., Ltd.
Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021
Modification Work for Reactor Drive System of Insulation Line No. 2, LG Hausys Co., Ltd.
Client: LG Hausys Co., Ltd.
Service: EPC
Year: 2021
Replacement Work of Mechanical Seal, CSIM Co., Ltd.
Client: CSIM Co., Ltd.
Service: EPC
Year: 2021
Pre-Operation Inspection Work for Reactor, CSIM Co., Ltd.
Client: CSIM Co., Ltd.
Service: EPC
Year: 2021
Supplementary Work for T-PROJECT, Lotte Fine Chemical Co., Ltd.
Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021
Replacement Work of Bag Filter Pulse PCB, Yooyoung Materials Co., Ltd.
Client: Yooyoung Materials Co., Ltd.
Service: EPC
Year: 2021
Replacement of Bottom Valve, Sangwon Chem Co., Ltd.
Client: Sangwon Chem Co., Ltd.
Service: EPC
Year: 2021
Repair and Replacement Work of Motor & Reducer and Related Works, LG Hausys Co., Ltd.
Client: LG Hausys Co., Ltd.
Service: EPC
Year: 2021
Modification Work for Fluidized Bed Dryer, Daehyup Tech Co., Ltd.
Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of TPC Carrier Drum, Lotte Fine Chemical Co., Ltd.
Client: Lotte Fine Chemical Co., Ltd
Service: EPC
Year: 2021
Replacement Work of Lip Seal (SR-160), CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of New Lab Receiver Body, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2021
Replacement Work of Hot Oil Valve, Sewon Chemical Co., Ltd.
Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2021
Repair Work for Internal Corrosion of R-1201 Reactor, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021
Manufacturing and Installation of STS Reactors and Cosmetic Purification System Equipment, FTC Korea Co., Ltd.
Client: FTC Korea Co., Ltd.
Service: EPC
Year: 2021
Wood Screw Fabrication for SK Chemical Project, Youngil Engineering Co., Ltd.
Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2021
Coal Screw Fabrication for SK Chemical Project, Youngil Engineering Co., Ltd.
Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2021
B-Project (Chemical Business Division), Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of Portable Pump Frame and Related Works, Eco Chemical Co., Ltd.
Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2021
A-Line Screw Feeder (2 Sets) Fabrication and Replacement, SUMaterials Co., Ltd.
Client: SUMaterials Co., Ltd.
Service: EPC
Year: 2021
Replacement Work of Lip Seals (SR-160, SR-220), CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021
Additional Electrical Panel Work and Related Works, Eco Chemical Co., Ltd.
Client: Eco Chemical Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of Condenser, Taesung Environmental Research Institute Co., Ltd.
Client: Taesung Environmental Research Institute Co., Ltd.
Service: EPC
Year: 2021
Replacement Work of Lip Seal, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of Silo Bridge Breaker, SK Chemical Co., Ltd.
Client: SK Chemical Co., Ltd.
Service: EPC
Year: 2021
Installation of New Equipment and Related Works, RAIENT Co., Ltd.
Client: RAIENT Co., Ltd.
Service: EPC
Year: 2021
Bag Filter (260 m³/min) Fabrication and Installation and Related Works, Cosmo Chemical Co., Ltd.
Client: Cosmo Chemical Co., Ltd.
Service: EPC
Year: 2021
LION Project Execution, Korea Shell Oil Co., Ltd.
Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2021
Drum Cleaning System Fabrication (Export to USA), Enchem Co., Ltd.
Client: Enchem Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of Hot Oil Tank and Related Works, Daekwang Industrial Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2021
New Reactor Project (4.5㎥ Reactor Part), Korea Research Institute of Chemical Technology
발주처 : 한국화학연구원
Service: EPC
Year: 2021
Heat Exchanger (Condenser) Fabrication and Delivery, Pharmicell Co., Ltd. Chemical Business Division
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2021
Replacement Work of Impeller Bolts for R-L304 and R-L305, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021
Repair Work of Rotary Evaporative Vacuum Dryer, Samyang Precision Chemical Co., Ltd.
Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of New Spare Shaft for R-1501 CL2 Reactor, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021
2 m³ Reactor and Utility Equipment – New Reactor Project, Wedel Materials Co., Ltd.
Client: Wedel Materials Co., Ltd.
Service: EPC
Year: 2021
NMP Recovery System Utility Work, Shin Sung ENG Co., Ltd.
Client: Shin Sung ENG Co., Ltd.
Service: EPC
Year: 2021
Modification Work of Utility Piping for Plant 1, WEMAS Co., Ltd.
Client: WEMAS Co., Ltd.
Service: EPC
Year: 2021
Reactor Modification Work at Gwangyang Plant, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2021
Installation of 10 m³ and 0.6 m³ Polyol Tanks for Foaming Area and Related Works, Korea Carbon Co., Ltd.
Client: Korea Carbon Co., Ltd.
Service: EPC
Year: 2021
Reactor & Vessel Head and Water Tank Fabrication for SUM C Project, Samsung Engineering Co., Ltd.
Client: Samsung Engineering Co., Ltd.
Service: EPC
Year: 2021
Machinery & Equipment Supply for New Plant Construction (Goesan Plant), LS Chem Co., Ltd.
Client: LS Chem Co., Ltd.
Service: EPC
Year: 2021
Soil Contamination Assessment (NMP Storage Tank), Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of Heat Exchanger and Drum for New Plant Construction at Onsan Plant, NH Chemical Co., Ltd.
Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021
Manufacturing of Reactor and Vessel for New Plant Construction at Onsan Plant, NH Chemical Co., Ltd.
Client: NH Chemical Co., Ltd.
Service: EPC
Year: 2021
S&T Heat Exchanger for R Project, Korea Petroleum Industrial Co., Ltd., Fields Engineering Co., Ltd.
Fields Engineering Co., Ltd.
Service: EPC
Year: 2021
R Project Pressure Vessel, Korea Petroleum Industrial Co., Ltd., Fields Engineering Co., Ltd.
Fields Engineering Co., Ltd.
Service: EPC
Year: 2021
R-1501 CL2 Reactor Shaft Machining and Related Works, Nica Korea Co., Ltd.
Fields Engineering Co., Ltd.
Service: EPC
Year: 2020
Replacement Work of Lip Seal (SR-160), CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020
Shaft Modification of Pre-Dispersion Mixer No. 2 & 3 (LGCNA), LG Electronics Production Technology Institute Co., Ltd.
Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2020
Replacement Work of Lip Seal, CS Chemical Co., Ltd.
Client: CS Chemical Co., Ltd.
Service: EPC
Year: 2020
Blower Motor Replacement and Installation Work, Giant Chemical Co., Ltd.
Client: Giant Chemical Co., Ltd.
Service: EPC
Year: 2020
Non-Destructive Testing (NDT) of Hazardous and Toxic Chemical Piping, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2020
Additional Construction Work for Vessel (Group B) under M1 Project, Ulsan Plant, Taekwang Industrial Co., Ltd.
Client: Taekwang Industrial Co., Ltd.
Service: EPC
Year: 2020
Installation of Grinder Hood at Damyang Recycling Plant, Hansol EME Co., Ltd.
Client: Hansol EME Co., Ltd.
Service: EPC
Year: 2020
Portable Melting System Fabrication and Delivery and Additional Works, IMC System Co., Ltd.
Client: IMC System Co., Ltd.
Service: EPC
Year: 2020
Replacement Work of Heater, Daekwang Industrial Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2020
Replacement Work of Level Transmitter, Eco Intech Co., Ltd.
Client: Eco Intech Co., Ltd.
Service: EPC
Year: 2020
Level Glass and Sight Glass Fabrication, One Engineering Co., Ltd.
Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020
Replacement Work of Heat Exchanger Bundle, Unisol Co., Ltd.
Client: Unisol Co., Ltd.
Service: EPC
Year: 2020
Replacement Work of Reactor Bottom Ball Valve and Related Works, WEMAS Co., Ltd.
Client: WEMAS Co., Ltd.
Service: EPC
Year: 2020
Level Glass Fabrication, One Engineering Co., Ltd.
Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020
Jacket Plug Valve Replacement Work, MNB Greener’s Co., Ltd.
Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2020
Modification Work for PT Tank Support, Doosan Mecatec Co., Ltd.
Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2020
Manufacturing of Paddle Impeller, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2020
High-Speed Shaft Replacement Work for Pre-Dispersion Mixer (LG Electronics Production Technology Institute), LG Electronics Co., Ltd.
Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2020
Cyclone Fabrication and Delivery, Neo Co., Ltd.
Client: Neo Co., Ltd.
Service: EPC
Year: 2020
Mixing Tank Fabrication and Delivery and Related Works, Shinjin Construction Co., Ltd.
Client: Shinjin Construction Co., Ltd.
Service: EPC
Year: 2020
Central Chute Fabrication and Delivery, Myungseong Tech Co., Ltd.
발주처 : 명성테크
Service: EPC
Year: 2020
Wax Separation Tank Fabrication, WCP Co., Ltd. (W-SCOPE KOREA)
Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2020
Instant Hot Water Heat Exchanger Repair Work at Dangjin Steel Plant, Hyundai Steel Co., Ltd.
Client: Hyundai Steel Co., Ltd.
Service: EPC
Year: 2020
Reclaimer No. 114 Installation for Raw Material Plant (Boom), POSCO Plantec Co., Ltd.
Client: POSCO Plantec Co., Ltd.
Service: EPC
Year: 2020
Heat Exchanger Fabrication and Delivery for Oligosaccharide Hydrolysis Process, Jaewon Industrial Co., Ltd.
Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2020
Wood Silo Screw Fabrication, Youngil Engineering Co., Ltd.
Client: Youngil Engineering Co., Ltd.
Service: EPC
Year: 2020
Dissolve Tank Fabrication and Delivery, AcuS Co., Ltd.
Client: AcuS Co., Ltd.
Service: EPC
Year: 2020
Steam Header Fabrication, WCP Co., Ltd. (W-SCOPE KOREA)
Client: WCP Co., Ltd. (W-SCOPE KOREA)
Service: EPC
Year: 2020
Manufacturing and Installation of LNG Stack, Hansol Papertech Co., Ltd.
Client: Hansol Papertech Co., Ltd.
Service: EPC
Year: 2020
Quality Improvement of IE-TPU Belt and Silo Relocation Project, DongSung Corporation Co., Ltd.
Client: DongSung Corporation Co., Ltd.
Service: EPC
Year: 2020
Manufacturing and Installation of 10 m³ Reactor, CSIM Co., Ltd.
Client: CSIM Co., Ltd.
Service: EPC
Year: 2020
Reactor Demolition and New Reactor Fabrication & Installation and Related Works, Sewon Chemical Co., Ltd.
Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2020
Portable Thinner Packing System Fabrication, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2020
Planned Maintenance Work for Heat Exchangers in Preparation for 2020 Energy Inspection, Hyundai Steel Co., Ltd.
Client: Hyundai Steel Co., Ltd.
Service: EPC
Year: 2020
High-Viscosity Combination Mixer & Press Equipment Installation Work, Daehyup Tech Co., Ltd.
Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2020
MC & WAX Regeneration System (WCP-5,6) Evaporator and Heat Exchanger Fabrication, One Engineering Co., Ltd.
Client: One Engineering Co., Ltd.
Service: EPC
Year: 2020
Hungary Project, Dongwha Electrolyte Co., Ltd.
Client: Dongwha Electrolyte Co., Ltd.
Service: EPC
Year: 2020
MS Heat Exchanger and Turbine Aftercooler Fabrication and Delivery, Hyundai Rotem Co., Ltd.
Client: Hyundai Rotem Co., Ltd.
Service: EPC
Year: 2020
200L PE Tank Weighing System Fabrication, Samyoung Sunhwa Co., Ltd.
Client: Samyoung Sunhwa Co., Ltd.
Service: EPC
Year: 2020
Ion Exchange Fiber Tank Fabrication and Installation Work, Samyang Precision Chemical Co., Ltd.
Client: Samyang Precision Chemical Co., Ltd.
Service: EPC
Year: 2020
Column (0.56 m³) Fabrication and Installation and Related Works, KOEM Co., Ltd.
Client: KOEM Co., Ltd.
Service: EPC
Year: 2020
FGD Wastewater Treatment Plant Project, Shinhung Industry Co., Ltd.
Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2020
MC Storage Tanks (50 m³, 3 Units) Fabrication and Installation, WPC Co., Ltd.
Client: WPC Co., Ltd.
Service: EPC
Year: 2020
Fluidized Bed Dryer Installation Work, Daehyup Tech Co., Ltd.
Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2020
Fin-Tube Type Heat Exchangers (4 Units) Fabrication for Yeosu CNT Project, LG Chem Co., Ltd.
Client: LG Chem Co., Ltd.
Service: EPC
Year: 2020
Mobile Stair Fabrication, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2020
Portable Melting System Fabrication and Delivery, Samyoung Sunhwa Co., Ltd.
발주처 : 삼영순화
Service: EPC
Year: 2020
Internal Repair Work for Reactor [RH-02], DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2019
Desuperheater Water Storage Tank Additional Fabrication, Shinhung Industry Co., Ltd.
Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019
New AC Plant (Phase 2) and Additional Works, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019
Jacket Ball Valve Replacement Work, MNB Greener’s Co., Ltd.
Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019
Raw Material Double Piping System Repair Work, MNB Greener’s Co., Ltd.
Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019
Co-Precipitation Tank Foreign Material Catcher Installation, POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019
Dock System Fabrication and Installation, Korea Shell Oil Co., Ltd.
Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019
COP-P Reactor (3 m³) Agitator Part Replacement Work, POSCO Chemical Co., Ltd.
Client : POSCO CHEMICAL
Service: EPC
Year: 2019
Installation of Component Storage Tanks and Related Additional Works, Korea Shell Oil Co., Ltd.
Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019
POSCO CHEMICAL COP-1 Agitating Tank Overhaul Work (2차)
Client : POSCO CHEMICAL
Service: EPC
Year: 2019
LG HAUSYS PFA Hopper Modification
Client : LG HAUSYS
Service: EPC
Year: 2019
Chamber Lift Repair Work for Existing Facility, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2019
Replacement Work of Motor & Reducer, MNB Greener’s Co., Ltd.
Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2019
Reactor Manhole Modification Work (5 Units), Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019
Bracket Fixing of Reactor and Non-Destructive Testing (NDT) for Hazardous Chemical Piping, Daesong Precision Chemical Co., Ltd.
Client: Daesong Precision Chemical Co., Ltd.
Service: EPC
Year: 2019
Motor Specification Change Work for Auxiliary Mixer Units No. 2 & 3 (CAN Electrode), LG Electronics Co., Ltd.
Client: LG Electronics Co., Ltd.
Service: EPC
Year: 2019
COP-1 Agitating Tank Overhaul Work, POSCO Chemical Co., Ltd.
Client : POSCO CHEMICAL
Service: EPC
Year: 2019
Leaching Facility Additional Works, SeAH M&S Co., Ltd.
Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2019
Replacement Work of Internal Coil for B-4 Tank, Korea Shell Oil Co., Ltd.
Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019
Pre-Mixer Fabrication and Installation, POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2019
E-1307 Equipment Fabrication, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019
Replacement Work of Heater, Daekwang Industrial Co., Ltd.
Client: Daekwang Industrial Co., Ltd.
Service: EPC
Year: 2019
Piping Modification Work, Korea Shell Oil Co., Ltd.
Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019
Adhesive Equipment Modification for Existing Production Facility, Hwasung Industries Co., Ltd.
Client: Hwasung Industries Co., Ltd.
Service: EPC
Year: 2019
Shaft Lower Support Fabrication, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2019
Hot Water Vessel Condensate Downstream Line Insulation Work, Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019
Fireproof Coating Work for Production Building, Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2019
Installation of New Drum Oven, Korea Shell Oil Co., Ltd.
Client: Korea Shell Oil Co., Ltd.
Service: EPC
Year: 2019
Skid Fabrication, Doosan Mecatec Co., Ltd.
Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2019
COPO1 Initial Tank Installation at Co-Precipitation Building (2F, Gumi Cathode Material Plant), POSCO Chemical Co., Ltd.
Client: POSCO Chemical Co., Ltd.
Service: EPC
Year: 2019
Skid Fabrication for ExxonMobil Project, Doosan Mecatec Co., Ltd.
Client: Doosan Mecatec Co., Ltd.
Service: EPC
Year: 2019
M-Project Execution, Myungil Formtech Co., Ltd.
Client: Myungil Formtech Co., Ltd.
Service: EPC
Year: 2019
Evaporation Precipitation Reactor Fabrication, DS Liquid Co., Ltd.
Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019
Hydrolysis Reactor Fabrication, DS Liquid Co., Ltd.
Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019
50 m³ Caustic Soda Storage Tank Fabrication and Installation and Related Works, Dankook Industrial Co., Ltd.
Client: Dankook Industrial Co., Ltd.
Service: EPC
Year: 2019
Desuperheater Water Storage Tank Fabrication, Shinhung Industry Co., Ltd.
Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019
M1 Project Vessel (Group B) Fabrication, Taekwang Industrial Co., Ltd.
발주처 : 태광산업㈜
Service: EPC
Year: 2019
Transfer Car Fabrication and Delivery for Shinseocheon Thermal Power Plant, Chosun Refractories Engineering Co., Ltd.
Client: Chosun Refractories Engineering Co., Ltd.
Service: EPC
Year: 2019
Reactor (12 m³) Fabrication and Installation and Related Works, KOEM Co., Ltd.
Client: KOEM Co., Ltd.
Service: EPC
Year: 2019
NGHI SON 2 BOT Thermal Power Plant Project Execution, Shinhung Industry Co., Ltd.
Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019
Vacuum Evaporation Reactor Fabrication, DS Liquid Co., Ltd.
Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2019
Condenser (45 m², 2 Units) Fabrication and Installation, KOEM Co., Ltd.
Client: KOEM Co., Ltd.
Service: EPC
Year: 2019
Condenser Channel Part Replacement Work, KOEM Co., Ltd.
Client: KOEM Co., Ltd.
Service: EPC
Year: 2019
Installation Work of Foundation Plate for Silo & Storage Tank, WCP Co., Ltd.
Client : WCP Co., Ltd.
Service: EPC
Year: 2019
Trailer & Tripper Frame Assembly Fabrication, Shinhung Industry Co., Ltd.
Client: Shinhung Industry Co., Ltd.
Service: EPC
Year: 2019
New Indoor Hazardous Materials Storage Facility Construction and Storage Tank Fabrication & Installation, Ceres F&D Co., Ltd.
Client: Ceres F&D Co., Ltd.
Service: EPC
Year: 2019
High-Temperature Reactor (5 m³) Project, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2019
Steam Header Fabrication for CP03 & CP04 Lines, WCP Co., Ltd.
Client : WCP Co., Ltd.
Service: EPC
Year: 2019
HWASEUNG CHEMICAL VIETNAM REACTOR 3M3 PROJECT (VIETNAM)
Client: Hwasung Chemical Vietnam Co., Ltd.
Service: EPC
Year: 2019
Reactor & Tank (316) Fabrication and Installation, CSIM Co., Ltd.
Client: CSIM Co., Ltd.
Service: EPC
Year: 2019
CWA Coater Supply Tank Fabrication, LG Electronics Production Technology Institute Co., Ltd.
Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2019
1.2 m³ Twin Mixer Teflon Coating Work, Daehyup Tech Co., Ltd.
Client: Daehyup Tech Co., Ltd.
Service: EPC
Year: 2019
C-Feeding System Modification Work, LS-Nikko Copper Inc.
Client: LS-Nikko Copper Inc.
Service: EPC
Year: 2019
Hazardous Material Transfer Tank Fabrication and Delivery, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2019
COP2 Reactor Motor & Reducer Replacement Work, POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018
Hot Oil Line Repair Work (RB-L302), Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
Safety Valve Replacement Work, MNB Greener’s Co., Ltd.
Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2018
FC Reactor Body Replacement and Related Works, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
Sand Filter Media Replacement Work at Air Products Korea 2nd Plant
Client: Air Products Korea 2nd Plant
Service: EPC
Year: 2018
M-107 Mixer (3 m³) Reducer Replacement Work, Unis Co., Ltd.
Client : Unis Co., Ltd.
Service: EPC
Year: 2018
Reactor Motor & Reducer Replacement Work and Related Works, MNB Greener’s Co., Ltd.
Client: MNB Greener’s Co., Ltd.
Service: EPC
Year: 2018
Cooling Air Line Temperature Sensor Installation Work, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Load Cell Installation Work for Vent Buffer Tank 1 m³ (VBT-200), Woojin Polymer Co., Ltd.
Client: Woojin Polymer Co., Ltd.
Service: EPC
Year: 2018
Reactor (5 m³) Shaft Sprocket Fabrication and Replacement Work, LG Chem Co., Ltd.
Client: LG Chem Co., Ltd.
Service: EPC
Year: 2018
Brass Nozzle Fabrication, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
Bag Filter Module Fabrication and Related Works, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Additional Powder Can Fabrication, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Foam Spray System Fabrication, Misan R&C Co., Ltd.
Client: Misan R&C Co., Ltd.
Service: EPC
Year: 2018
Cooling Water Pump Replacement Work, ABC Nanotech Co., Ltd.
Client: ABC Nanotech Co., Ltd.
Service: EPC
Year: 2018
Cooling Air Supply Y-Piping Modification Work, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Cooling Air Line Modification Insulation Work, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Chiller Water Pump On/Off Panel Fabrication, LG Hausys Co., Ltd.
Client : LG HAUSYS
Service: EPC
Year: 2018
Jacket Mixer Body Fabrication and Related Works, Jungwon Engineering Co., Ltd.
Client: Jungwon Engineering Co., Ltd.
Service: EPC
Year: 2018
Evaporator Fabrication and Related Works, One Engineering Co., Ltd.
Client: One Engineering Co., Ltd.
Service: EPC
Year: 2018
Receiver Tank Fabrication for Experimental Facility and Related Works, POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018
Evaporator Modification Work, DS Liquid Co., Ltd.
Client: DS Liquid Co., Ltd.
Service: EPC
Year: 2018
Heat Exchanger Fabrication and Installation and Related Works, LG Chem Co., Ltd.
Client: LG Chem Co., Ltd.
Service: EPC
Year: 2018
MS-Bed Regeneration Heater Improvement and Replacement for Oxygen Plant 14, POSCO Co., Ltd.
Client : POSCO Co., Ltd.
Service: EPC
Year: 2018
CNA Electrode Line No. 3 Auxiliary Mixer Unit, LG Electronics Production Technology Institute Co., Ltd.
Client: LG Electronics Production Technology Institute Co., Ltd.
Service: EPC
Year: 2018
Reactor (7 m³) Fabrication and Installation and Related Works, Sewon Chemical Co., Ltd.
Client: Sewon Chemical Co., Ltd.
Service: EPC
Year: 2018
Reactor (4,000 L) Fabrication and Related Works [JMC], GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
Reactor (2,500 L) Fabrication and Related Works [EMEX Solution], GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
Reactor Fabrication and Related Works [Miwon Commercial], GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
Pilot Reactor Modification Work, AK Chemtech Co., Ltd.
Client: AK Chemtech Co., Ltd.
Service: EPC
Year: 2018
5 m³ Mixer Plant Fabrication, Hera Industry Co., Ltd.
Client: Hera Industry Co., Ltd.
Service: EPC
Year: 2018
Reactor Bare Vessel Fabrication and Related Works [Sunjin Beauty Science], GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
MC Storage Tanks (50 m³) Fabrication and Installation, WCP Co., Ltd.
Client : WCP Co., Ltd.
Service: EPC
Year: 2018
High-Temperature Reactor (5 m³) Fabrication and Related Works, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2018
Vessel and Filter Components for Plant Expansion Project (Gwangyang Site), POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018
Leaching FRP Facility Installation Work, SeAH M&S Co., Ltd.
Client: SeAH M&S Co., Ltd.
Service: EPC
Year: 2018
2,000 L G/L Reactor Fabrication for Sambo Precision Chemical, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
1,000 L Reactor Fabrication and Related Works for Woojin Polymer, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
10,000 L Reactor Fabrication and Related Works for Cheonbo & Miwon Commercial, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
Reboiler Fabrication and Related Works, Jaewon Industrial Co., Ltd.
Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2018
WJF Project – 3rd Class Production Facility and Two Storage Tanks Fabrication and Installation, Wisol Co., Ltd.
Client: Wisol Co., Ltd.
Service: EPC
Year: 2018
Cylindrical Reformer Fabrication (100 Units), S-Fuelcell Co., Ltd.
Client: S-Fuelcell Co., Ltd.
Service: EPC
Year: 2018
Manufacturing and Installation of 15.5 m³ Storage Tank, KOEM Co., Ltd.
Client: KOEM Co., Ltd.
Service: EPC
Year: 2018
Replacement Work of Hoist, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
3,000 L Reactor Fabrication for Garam Nano, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
CE-8000 and 20,000 L Reactor Fabrication (Cost-Based Work) for Dongyang, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
10 m³ Bromine Receiver Bare Vessel Fabrication, Dongyang Industry Co., Ltd.
Client: Dongyang Industry Co., Ltd.
Service: EPC
Year: 2018
ROI Reactor (10 m³) Replacement and Related Works, Nica Korea Co., Ltd.
Client: Nica Korea Co., Ltd.
Service: EPC
Year: 2018
COP-P PP Building Reactor (10 m³) Expansion Project, POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018
COP-1 MP1 Modification Work, POSCO ESM Co., Ltd.
Client: POSCO ESM Co., Ltd.
Service: EPC
Year: 2018
25 m³ G/L Reactor Bare Vessel Fabrication and Related Works, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
Heat Recovery System for Biopharmaceutical Manufacturing Process, Pharmicell Co., Ltd.
Client: Pharmicell Co., Ltd.
Service: EPC
Year: 2018
Diaphragm Pump Replacement and Related Works, Segye Chemical Co., Ltd.
Client: Segye Chemical Co., Ltd.
Service: EPC
Year: 2018
Heat Exchanger Fabrication, Scandinavian Biogas Korea Co., Ltd.
Client: Scandinavian Biogas Korea Co., Ltd.
Service: EPC
Year: 2018
Modification Work of Heat Exchanger, Jaewon Industrial Co., Ltd.
Client: Jaewon Industrial Co., Ltd.
Service: EPC
Year: 2018
Reactor (6 m³) Fabrication and Related Works, KOEM Co., Ltd.
Client: KOEM Co., Ltd.
Service: EPC
Year: 2018
Reactor (10 m³) Fabrication and Related Works, GLK Powdler Co., Ltd.
Client: GLK Powdler Co., Ltd.
Service: EPC
Year: 2018
Cyclopentane Storage Tank Plant (30 m³) Fabrication and Related Works, Gana IS Co., Ltd.
Client: Gana IS Co., Ltd.
Service: EPC
Year: 2018
Reactor Modification Work, Mecapoly Co., Ltd.
Client: Mecapoly Co., Ltd.
Service: EPC
Year: 2018
Foam Spray System Fabrication, Hanjoong Yuhwa Co., Ltd.
Client: Hanjoong Yuhwa Co., Ltd.
Service: EPC
Year: 2018
Reactor (0.8 m³) Replacement Work, DFC Co., Ltd.
Client: DFC Co., Ltd.
Service: EPC
Year: 2018

